Laserfiche WebLink
A J OA U I Environmental Health Department <br /> COUNTY <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> PARKWOODS GAS & FOOD 1612 W HAMMER LN, STOCKTON May 27, 2020 <br /> Other Violations <br /> 2010 1 See below Unlisted General violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 103 HSC 25292.2, 25299.30 Failure to submit and maintain complete and current financial responsibility documents. <br /> OBSERVATION: Financial responsibility documents have not been submitted to the EHD. The most recent <br /> financial responsibility documents in CERS are dated 05/09/2019. <br /> REGULATION GUIDANCE: Current financial responsibility documents are required to be submitted annually. <br /> CORRECTIVE ACTION: Immediately log into the California Environmental Reporting System (CERS) at <br /> http://cers.calepa.ca.gov/, and upload the required documents. <br /> This was corrected on site. <br /> This is a minor violation. <br /> 206 CCR 2712 Failure to comply with UST operating permit conditions. <br /> OBSERVATION: The diesel product overfill prevention was repaired or replaced between 9/19/2019 and <br /> 01//30/2019 and a permit was not obtained from the EHD. <br /> REGULATION GUIDANCE: Emergency repairs relating to UST system monitoring and release detection may be <br /> performed by a properly licensed, trained, and certified contractor pursuant to the EHD's policy and a permit <br /> obtained within one business day from the EHD. All other repairs must have a permit submitted to and approved by <br /> the EHD prior to beginning work. <br /> CORRECTIVE ACTION: Immediately obtain a permit from the EHD for the diesel product overfill prevention repairs <br /> or replaced . A"Failure to Obtain a Permit" penalty applies. <br /> This is a minor violation. <br /> 313 HSC 25290.1, 25290.2, 25291 Failure to construct, operate, and maintain primary containment as product-tight. <br /> OBSERVATION: Seepage was detected below the shear valve in under dispenser containment (UDC) 1/2, 3/4 and <br /> 7/8 indicating a leak in the primary containment. <br /> REGULATION GUIDANCE: All primary containment for the UST system must be product tight. <br /> CORRECTIVE ACTION: Immediately have a properly licensed, trained, and certified contractor repair or replace the <br /> failed component(s), under permit and inspection of the EHD if necessary. <br /> This is a minor violation. <br /> Overall Inspection Comments: <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, by 06/26/2020 . <br /> FA0003611 PR0231127 SCO01 05/27/2020 <br /> EHD 23-01 Rev.9/20/2019 Page 4 of 5 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />