My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2300 - Underground Storage Tank Program
>
PR0508452
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2020 2:34:55 PM
Creation date
7/10/2020 2:17:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0508452
PE
2361
FACILITY_ID
FA0007787
FACILITY_NAME
PACIFIC CAR WASH/MARKETPLACE INC
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024013
CURRENT_STATUS
01
SITE_LOCATION
4405 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JSA # ASITCTC 04. 10 <br /> ADAMS SERVICES, INC . <br /> WORK PLAN FOR CLEANING, AND INERTING UST ' S FOR <br /> THE PURPOSE OF TEMPORARY CLOSURE AND/OR PRIOR TO <br /> Jiio <br /> EXCAVATION. <br /> 1 . Tailgate safety meeting at jobsite discussing site specific concerns and work <br /> procedures before work commences . <br /> 2 . Verify tank volumes by stick checking. <br /> 3 . Properly ground Vacuum truck, pump out and triple rinse product lines back to <br /> the tank using high pressure water and cleaning solution . <br /> 4 . If required dismantle piping from the tank tops including turbines , risers, product <br /> line manifolds and vent lines to gain sufficient access to the tank bungs . <br /> 5 . Introduce the vacuum truck hose into the tank to start pumping out remaining <br /> product . <br /> 6 . Once residual product has been removed from the tank, cleaning will commence <br /> using high pressure washing equipment and various length wands to properly <br /> access the tank interior, washing will continue using water and cleaning solution <br /> until the atmosphere of the tank attains a reading of less than 10% LEL and all <br /> tank bottom sludge has been removed. <br /> 7 . All tank cleaning rinsate will be pumped out of the tank and be profiled and <br /> disposed of in accordance with U. S . Code of Federal Regulations (CFR) Title 40, <br /> Parts 260-279 and CCR Title 22 , Div . 4 , Chapter 30 and shipped using a Uniform <br /> Hazardous Waste Manifest to an approved T. S .D.F . <br /> 8 . Dry Ice will be placed in the tanks at a rate of 25lbs/ 1000gal . tank capacity, tanks <br /> are considered inerted once oxygen level is below 10% <br /> 9 . Verify oxygen readings, replace all fittings and apparatus , secure tanks and site . <br /> The following guidelines published by the American Petroleum Institute (API) <br /> are used in training and practice and can be furnished upon request. <br /> API 2219 : Safe Operation of Vacuum Trucks in Petroleum Service . <br /> API 2015 : Safe Entry and Cleaning of Petroleum Storage Tanks . <br /> NFPA : 326 Standard for the Safeguarding of Tanks and Containers for Entry, <br /> Cleaning or Repair. <br /> ISI <br />
The URL can be used to link to this page
Your browser does not support the video tag.