Laserfiche WebLink
_ UNv JAN J OAQ U I N Environmental Health Department <br /> °P °o <br /> Q /IV � •. <br /> " . '' r11 `v' ; COUNTY Wayne Fox, REHS , Interim Director <br /> Greatness grows here . PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> Michael Kith , REHS <br /> Melissa Nissim , REHS <br /> July 16 , 2020 <br /> SARAH JABLONSKY- CONSTRUCTION MANAGER <br /> WALTON ENGINEERING <br /> PO BOX 1025 <br /> WEST SACRAMENTO , CA 95691 <br /> Re : PACIFIC CAR WASH/MARKET PLACE INC <br /> 4405 PACIFIC AVE SR0082296 <br /> STOCKTON , CA 95207 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of <br /> the application for a permit to do the following on the underground storage tank ( UST) system at <br /> the above noted address : <br /> • Remove dispensers # 10/ 11 and 12/ 13 , associated piping , and under dispenser <br /> containment sumps ( UDCs ) <br /> • Repair 87 and 91 STP sump penetration fittings <br /> The permit has been approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work . All new addenda supersede the previous ones . <br /> 3 . Provide written notification to ust( sigov . org to arrange the following appointments ( a <br /> 48 - hour notice is required for inspection appointments ) . <br /> a . 24- hour hydrostatic test (or equivalent) on the 87 and 91 STP sumps <br /> b . Witness soil and/or water sampling <br /> c . Primary piping test : Witness tightness test performed by SWRCB licensed tank <br /> tester or receive passing 0 . 1 gallon per hour test results from the PLLD ( if <br /> installed ) . A visual inspection is required for PLLD tested lines . <br /> d . Since concrete will be broken near the UST and piping , a secondary containment <br /> test must be performed on all affected components once concrete is poured in <br /> accordance with the manufacturer' s guidelines and test results submitted to the <br /> EHD within 30 days of testing . <br /> Please be aware that the facility cannot operate the UST system prior to the EHD <br /> inspection and approval. <br /> 4 . Any individual performing the work of a service technician must meet the following <br /> qualifications : <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www . sjgov. org/ehd <br />