My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3304
>
2300 - Underground Storage Tank Program
>
PR0516354
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 1:13:16 PM
Creation date
7/10/2020 2:18:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0516354
PE
2361
FACILITY_ID
FA0012437
FACILITY_NAME
CHEVRON 352324
STREET_NUMBER
3304
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
07120013
CURRENT_STATUS
01
SITE_LOCATION
3304 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of s) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: 6/22/2020 <br /> If you already have a site plan that shows all required information,you may include it rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (df used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault,4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> +� Sae Address 0304 W Hammer Lane Stockton CA 95207 <br /> STORE <br /> f <br /> __F-Stop <br /> C <br /> . . . . . 91 <br /> C : o <br /> : o : <br /> . . . . . . . . . . . x . . . . . . <br /> . . . . . . . . . . . . . . L DIE <br /> . . . . . 87 a <br /> F <br /> . . . . . . . <br /> A=ATNULAR <br /> x F=FILLS <br /> L T=TL'RSLNE <br /> . . . . X P=PROBE <br /> =PIPLNG• V=V.•1POR <br /> (_ARROWS) L X=SLAP SE.VSOA <br /> Dray.i=of L=Leak Detector <br /> piping stint of . . . . �I=\Ian�car <br /> sump and UDIC's. . . . . . . B=Brine Sensor <br /> No wdetsrotutd I=Stuart Sensor <br /> draft-mg i= . . . . 5=SIP <br /> accurate,rre C=Floats Ce Chain.; <br /> c=annot speculateAnn item:undo Zmund:i=are no:iicibde to rdte rert((iing terduare e a E=E Stop <br /> blue prints. . . . . . . . prgfas,iond opinion ont and ae:adaLr!or informanonai purpose,:. ✓rating <br /> �•'V�7� no:to sra.a <br /> Date map tras drawn:0.22.20 <br /> Instructions <br /> If you already have a diagram that shows a7 required in`ormadon.you rr.ay include 4,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Cteady identify ktc tcns ofthe following equipment,#installed:monitoring system saatral panels sensors monitoring tank <br /> annular spaces,ssumps,dispenser pans,spill containers.or other secc-dary containment areas mechanical or electronic line leak detectors:and in-tank liquid level <br /> probes(if used fcr leak derii ian i. Ir the s=ate prorded.ncte th=e dat-_;his Site Plan was prepared. <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.