My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
9015
>
2300 - Underground Storage Tank Program
>
PR0521738
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 8:09:54 AM
Creation date
7/10/2020 2:22:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0521738
PE
2371
FACILITY_ID
FA0014762
FACILITY_NAME
JD Service Station, Inc.
STREET_NUMBER
9015
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
THORNTON
Zip
95686
CURRENT_STATUS
01
SITE_LOCATION
9015 WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page s of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection), 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> r — - - — -- - - -- -- - -- - - - - -- - - -- -- - - - - -- - - - -- -- -- - - - - - - -- - - - - - - - - - - -- - - --; <br /> Site Address: THORNTOtY CHEVRON 9015 WALNUT GROVE ROAD THORNTON CA 95668 — <br /> _� CHE %aON STORE <br /> C7 I <br /> ITir tPIPI'G }(ARROWN <br /> BDrav,ingofpipingexit of sump and c _ x UDC's. Irounderground 3CSJd 4pS cannot speculate <br /> blueprints, ti ` <br /> 12- L01 I <br /> l - <br /> — 1_ WALNUT GRO1 E ROAD KEIT �— <br /> A = AN.NUAR - - <br /> F = FILLS - - <br /> T = TURBLNE <br /> P = PROBE - -- <br /> V = VAPOR <br /> . Y = SU\tP SEi!QSOR - -- <br /> L <br /> -4r.• itene «trk7Worarl9rre m-e not %isible to O cei [timg t•rolariciarr Ice a I 5enaor <br /> — FQfessiorrrloFirdwton(i crezlrresde�e ,fw ir/onmtromlFru�xc�. Drrnring S = STP <br /> mtrosede . . . C = FIGIL3 & mina <br /> —� Date map was drawn: 4.+9f 19. <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System CerhTication. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, I installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces• sumps, dispenser pans, spill containers, or other secondary containment areas. mechanical or electronic line teak detectors; and inAank liquid levet <br /> probes (if used for teak detection). In the space provided, note the date this She Plan was prepared. <br /> LEGEND <br /> I--I-t <br /> I FI I � � T <br />
The URL can be used to link to this page
Your browser does not support the video tag.