Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM ( Page 1 of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection ® 36 Month Inspection <br /> I . FACILITY INFORMATION <br /> CERS ID 10443520 Date of Overfill Prevention Equipment Inspection <br /> 19/26/ 18 <br /> Business Name (Same as Facility Name or DBA-Doing Business As.) <br /> THORNTON CHEVRON <br /> Business Site Address City ZIP Code <br /> 9015 WALNUT GROVE THORNTON, CA 195351 <br /> II , UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the iCC Certification.) Phone # <br /> DAVE WINKLER 209 744 - 0112 Ext. <br /> Contractor/Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 08- 1739 8883059-UT 1 -31-20 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br /> FF- EBW Phil-Tite EVR Phase 1 1009853708 Ex 11 - 16- 18 OPW 104-633 Ex 3-14-2020 Emco #3207 Ex. 09-21 -2020 VR: B34975 ATG: 2/8/20 <br /> 111 , OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method Used : ® Manufacturer Guidelines (SpeNbEDER ROOT REMOVED PROBES <br /> ❑ Industry Code or Engineering Standard (Specify) <br /> ❑ Engineered Method (Specify) <br /> Attach the inspection procedures and all documentation required to determine the results. # of Attached Pages : 5 <br /> Tank ID : (By tank number, stored product, etc.) 87 91 DSL <br /> What is the tank inside diameter? (inches) 119 .60 119 . 60 119 . 60 <br /> Is the fill piping secondarily contained? I3d Yes ❑ No M Yes ❑ No M Yes ❑ No ❑ Yes ❑ No <br /> Is the vent piping secondarily contained? ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No ❑ Yes ❑ No <br /> VEEDER ROOT VEEDER ROOT VEEDER ROOT VEEDER ROOT <br /> Overfill Prevention Equipment Manufacturer(s) <br /> PROBE PROBE PROBE <br /> What is the overfill prevention equipment ❑ Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow <br /> response when activated? ❑ Restricts Flow ❑ Restricts Flow ❑ Restricts Flow ❑ Restricts Flow <br /> (Check all that apply.) In AIV Alarm ® AN Alarm ® AIV Alarm ❑ AIV Alarm <br /> Are flow restrictors installed on vent piping? ❑ Yes M No ❑ Yes M No ❑ Yes IN No ❑ Yes ❑ No <br /> At what level in the tank is the overfill prevention <br /> set to activate? (Inches from bottom of tank.) 100 100 101 <br /> What is the percent capacity of the tank at which 90 90 90 <br /> the overfill prevention equipment activates? <br /> Is the overfill prevention in proper operating ® Yes IN Yes [XYes ❑ Yes <br /> condition to respond when the substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the appropriate level? (Specify in section V.) (Specify in section V.) (Specify in section V. ) (Specify in section V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ® Pass ❑ Fail M Pass ❑ Fail [X Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> All items marked Fail' must be explained in this section. Any additional comments may also be provided here. <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> 1 hereby certify that the overfill prevention equipment was inspected in accordance with California Code of Regulations, title 23, division 3, <br /> chapter 16, section 2637.2 and all the information contained herein is accurate. <br /> UST Service Technician Signature (6 ] <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground storage tank ICC = International Code Council, AN = Audible and visual <br />