Laserfiche WebLink
R E ._ <br /> We have created a basic " How To Laminate " video which <br /> can be found on our website at www. sbravo . com /videos ' ICT 4 'ZRO <br /> RONMENTAL HEALTH <br /> FIBERGLASSING BASE SUMP TO COLLAR OR TAI� �I ,-, � � ,-, T � n �- �, � <br /> A as Pre-cut several dozen pieces of 6 " wide fiberglass mat to lengths of 20-24 " . You will need 3 layers of these mat strips <br /> for the INSIDE and OUTSIDE joints of each piping sump . <br /> B - Mix resin and catalyst together with mix stick thoroughly. <br /> C - Use paint roller to apply resin generously to a smooth surface . Spread the resin so it 'wets out' an area larger than the <br /> strip of fiberglass mat . ( Fig . C) <br /> D - Apply one layer of fiberglass mat to the resin and use the paint roller to add more resin to fully saturate it . ( Fig . D ) <br /> E - Lay down another strip of fiberglass mat , staggering the new layer ONE INCH . This means to offset the next <br /> fiberglass strip horizontally ( lengthwise ) 1 " to the right . Roll more resin into the new strip to saturate it. ( Fig . E) <br /> F - Repeat Step E , offsetting another strip of fiberglass mat and using the paint roller to add more resin to it until it is <br /> fully saturated . ( Fig . E) i <br /> G - Use a Chamfer roller to completely roll over the pre-soaked fiberglass strip while it is on the cardboard , <br /> horizontally and vertically, to run out any air bubbles . ( Fig . G ) <br /> H as Apply each "patch " to the tank sump seam , over the last , and overlap the ends by FOUR INCHES . Use the <br /> chamfer roller to roll out any air that applying the patches to the sump wall may have caused . Flow- coat with remaining <br /> resin if you wish . DO NOT DISTURB SUMP WHILE LAMINATION IS CURING . Allow for a full cure time . <br /> - �� -- <br /> Fig . C Fig . D <br /> { <br /> pow , _ <br /> AP <br /> off � A <br /> � -'° <br /> till <br /> qd <br /> ,< <br /> of <br /> 4' fi ac` t <br /> pad — � . <br /> I Fig . E Fig . G <br /> LA .� <br /> sk <br /> 1" add <br /> 2 ' CHAMFER ' <br /> P� ER - ROLLER <br /> , t <br /> 6,. 100111111 <br /> u V ` APER 2 ' S <br /> I ,. <br /> LAYERadLAYER <br /> . <br /> ' r - <br /> 2 ii -TSUMP - LAMINATI0N - 14A <br />