My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
345
>
2300 - Underground Storage Tank Program
>
PR0540987
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2021 10:48:44 AM
Creation date
7/10/2020 2:23:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0540987
PE
2351
FACILITY_ID
FA0023459
FACILITY_NAME
Pilot Travel Center Lathrop - 1017
STREET_NUMBER
345
STREET_NAME
ROTH
STREET_TYPE
Rd
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
345 Roth Rd
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! i P <br /> Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities <br /> maty containment of secondarily contained spills <br /> �i <br /> buckets . ARNINGAs Use only an airr pperated va�au- <br /> um source or a vacuum p tiny pdwere `6y <br /> 6.3. 2 Description of Test. Using a specially an explosion-proof motor. Vacuum pumps <br /> equipped test cover, a partial vacuum is applied to with electric motors that are not explo- <br /> the spill bucket. The vacuum level is monitored for sion-proof may ignite flammable vapors. <br /> a 1 -minute period. If a portable air compressor is used , it <br /> should be located at least 20 feet away <br /> 6.3. 3 Test Equipment . Test equipment shall from the venturi-eductor or outside any <br /> include: Class 1 , Division 1 area. <br /> • Vacuum test apparatus (The test apparatus may <br /> be available from the spill bucket manufacturer. 6 .3.4 preparation . <br /> It includes an air pressure regulator, a vacuum <br /> source, a vacuum gauge with a minimum 0-50 1. Remove and properly dispose of any liquid and <br /> V <br /> nch water column range and a control valve. The debris (leaves , sediment and trash) in the spill <br /> control valve is used to adjust the vacuum level.) ; bucket. Clean the spill bucket and examine it for <br /> • Test cover (The cover is equipped with a test damage, defects or improperly installed compo- <br /> nents. If there are loose components (e. g.*, loose <br /> fittin(by .) ; band clamps or bolts) , tighten these items before <br /> • Plumber 's plug (appropriate size, if used) ; performing the integrity test. If there are items <br /> • Stopwatch or other time-measurement device that must be repaired or replaced (e. g . , deterio- <br /> capable of measuring a 1-second increment; rated gaskets/seals or drain valves), notify the <br /> owner/operator to obtain approval before pro- <br /> • Gasketing material (The purpose of the gas- ceeding with the needed repairs. <br /> keting material is to provide an air-tight seal <br /> between the test cover and the spill bucket.) . 2. Examine the fill cap and adapter fitting for <br /> loose, missing or damaged parts and make nce- <br /> essary repairs . Make sure that the seal on the fill <br /> o - so° water column cap is present and in good condition. The cap <br /> Vacuum vacuum Gauge must fit securely and be leak-tight on the riser, <br /> Source :7': A leaking cap will result in a failed test. As an <br /> alternative to a tight fill cap, use a plumber 's <br /> plug in the fill riser. <br /> Control 3 . The s ill bucket drain valve if resent, must be <br /> Valve p p <br /> leak-tight to pass the test. If the drain valve is <br /> not leak"tight, it may be removed and perma- <br /> nently plugged. <br /> e ' e permanently lu m ensure <br /> NOTE: B for <br /> P Y P gg g� <br /> that local regulations allow the drain valve to <br /> Piumbes Ftug`in' beermanentl lu ed. <br /> ? T4nk.Rlser P1Pe. . P Y P gg <br /> 4. Clean an contamination from the to surface <br /> Y P <br /> of the spill bucket where the cover makes a seal <br /> and line it withasketin material. <br /> g g <br /> S. Place the test <br /> cover on the spill bucket con <br /> - <br /> firming that it makes a tight seal with the gas- <br /> keting material . <br /> FIGURE 6-2. The cover must make a tight seal with the 6 . Connect the line from the vacuum source to the <br /> splll bucket to prevent leakage when the vacuum Is adapter on the cover. <br /> pulled during the test. <br /> 7. If the spill bucket is found to have cracks, loose <br /> parts or separation of the bucket from the fill <br /> pei . org i� <br />
The URL can be used to link to this page
Your browser does not support the video tag.