My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18662
>
2300 - Underground Storage Tank Program
>
PR0505356
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
7/13/2020 4:42:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0505356
PE
2361
FACILITY_ID
FA0006733
FACILITY_NAME
GEORGES BP MINI MART
STREET_NUMBER
18662
Direction
N
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
18662 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} <br /> i <br /> f <br /> i <br /> TEM RETROFIT OR REPAIR ta ION <br /> UST SYS ,,;� � <br /> ( Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) { : ' <br /> 1 . Site map enclosed? YES [ ] NO [ ] <br /> - r+ ,� IR �h�hLNTAL. <br /> 2 . Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component, describe how this will be done . ( If <br /> adding piping , UDC 's , or other UST equipment, or performing tank top upgrade , use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review) : <br /> Remove existing dispensers install 4 new product dispensers <br /> Remove and replace back island diesel dispensers , 1 ) Hi-flow diesel dispenser, 2 ) Satellite dispensers <br /> Install Bravo conversion frames <br /> poSsil� Geld S ✓t . <br /> 4 . List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval ) : <br /> 4) Wayne Ovation Dispensers <br /> 2 ) Wayne Ovation Satellite Dispensers <br /> 1 ) Wayne Ovation Hi-Flow Dispensers <br /> 7) Bravo Conversion Frames <br /> EH230038 (revised 12-11 -15) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.