My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18662
>
2300 - Underground Storage Tank Program
>
PR0505356
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
7/13/2020 4:42:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0505356
PE
2361
FACILITY_ID
FA0006733
FACILITY_NAME
GEORGES BP MINI MART
STREET_NUMBER
18662
Direction
N
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
18662 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTALLATION MATERIALS CHECKLIST <br /> Tools & Equipment F] Offsets , elbows , nipples , unions , Etc . . <br /> Concrete Anchor Bolts * Plastic caps (sow plugs ) for nuts / bolts <br /> �k S . Bravo Systems , Inc . does not include Concrete Anchor Bolts with its Conversion Frames . <br /> PRE = INSTALLATION CHECKLIST <br /> ❑ Ensure that you have all your permits in order, including your Bravo Certification Card . <br /> Conversion Frame is free of damage ? <br /> F] Physically check the Dispenser, Sump and Conversion Frame drawings before installation ? <br /> NO modification to the Conv- Frame is necessary? If so , Call 323 - 8884133 immediately. <br /> INSTALLATION CHECKLIST <br /> Dispenser was carefully removed and any spills contained ? <br /> Drawings for all components are on -site and have been reviewed for any problems ? <br /> F] Conversion Frame is securely bolted to the existing UDC Sump with minimum 1 /2 " bolts ? <br /> If OPP or a Non - Bravo Systems UDC is existing , were a minimum of 4 anchor bolts <br /> securely installed directly to the concrete ? <br /> F1All electrical conduits are adjusted correctly to mate with the new dispenser? <br /> All product inlets are pre- plumbed with approved offsets , elbows , pipe , etc . . ? <br /> Conversion Frame was inspected for dents or damage ? <br /> Dispenser was carefully lined up and securely bolted to the Conversion Frame ? <br /> 4 ii - ConversionFrame 3-25-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.