Laserfiche WebLink
Be sure to always READ THE DRAWINGS or plans to make <br /> sure that your mounting points are the same . Call Bravo <br /> Systems if any problem occurs . <br /> A2 - Position and bolt down conversion frame to the dispenser pan using the anchor plates of the <br /> conversion frame with minimum 1 /2 " Diameter bolts . Use plastic caps to cover the bolts/nuts . <br /> For Non - Bravo Sumps - A minimum of Four anchor bolts must be secured directly to concrete . <br /> A3 - Adjust electrical conduits to line up with the new dispenser if necessary. <br /> A4 - Pre - plumb all product inlets and vapor recovery line with offsets and /or rigid pipe and elbows <br /> if necessary. <br /> DEPENDING ON NEW DISPENSER USED AND/OR <br /> OFFSET APPLICATION , THE RISER ON THE DISPENSER MAY <br /> NEED TO BE SHORTENED TO ACCOMMODATE THE SPACE <br /> TAKEN UP BY THE USE OF OFFSETS , ELBOWS , ETC . . . <br /> A5 - Position and bolt down the dispenser to the conversion frame with the anchor bolts provided . <br /> E <br /> Filter to <br /> m L(D) <br /> Dispenser <br /> Base Vdpor < /� Meters FZ; <br /> e <br /> BRAVO <br /> OFFSET <br /> ' =__ <br /> Anchor Bolt BRAVO <br /> OFFSET <br /> - - Cocnrete Anchor <br /> Anchor Bolts <br /> Plate 4 <br /> 4' , a d a a 4 ° tl, . <br /> e, 4 rd 4 • .aI <br /> 0 470. BRAVO BOA r C V <br /> a b <br /> ° a . . FOR OLD Q' Equipment shown is for " <br /> 40 ° 44 ° q : a • ° DISPENSER illustration purposes only <br /> to 4 <br /> a . to I I •a , <br /> a <br /> and is not a reference <br /> for your layout within <br /> the hydraulic cabinet <br /> ,• <br /> Y <br /> : . to <br /> f : . too 1 <br /> t • . : „ It I <br /> ' <br /> : . . <br /> .. . . . . . . . . . .. : . . . . 2 ikConversionFrame 3 - 25 -08 <br />