Laserfiche WebLink
a <br /> Turbine/Piping Sump Integrity <br /> Testing; <br /> Hydrostatic Testing Method <br /> Facility: Kaiser Permanente Date: 8 _ 1 . 19 <br /> Address: 7373 West Ln Testing Company< Wilkey ' s Construction , Inc . <br /> City, State, Zip: Stockton ` CA 95210 Tester Name: Jesse Nelson <br /> Containment Sump ID T1 Diesel <br /> Containment Sump Manufacturer Western Fiberglas <br /> Containment Sump Material Fiberglass <br /> Liquid and debris removed from <br /> Sump?* [x ] Yes [ ] No [ ] Yes I ] No [ ] Yes I ] No I ] Yes [ ] No <br /> Visual Inspection # [x] Pass [ ] Fail [ ] Pass [ ] Fail [ ] Pass [ ] Fail [ ] ; Pass [ ] Fail <br /> Sump Depth: 84111 <br /> Height from Tank Top to Highest <br /> Piping Penetration: 201+ <br /> Test StartTlme: l l . 6 arrt <br /> Starting Water Level 4062 <br /> Test End Time. 11 * 21 am <br /> Ending Water Leval <br /> Water Level Change 0400 <br /> Test Duration: 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> Pass/fail criteria: Must pass visual inspection. Water level drop of less than 4.002 inches. <br /> l eet 77-l es tts ,,, , ., %[ Rps [ ] 1`i i [ -] Pasa w Fait .. _ „ [..1 Pass j ] Fail [.. i ass <br /> Comments <br /> Water removed and stored for future testing . Test Plugs removed . Sensor <br /> put back in place . <br /> *All liquids and debris must be disposed of property . <br /> # No cracks, loose parts or separation of the containment sump, <br /> Technician Signature. Date: 9 <br /> Rev. 11 /0$/2018 Job Number: 19927 <br />