Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 4 of e <br /> VIII . MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitorintY. YN NA <br /> Are the visual and audible alarms operational? Q r., Q <br /> Were all sensors visuals Inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely Q ❑ ❑ <br /> functionally tested and confirmed operational? <br /> Were all sensors Installed at lowest point of secondary containment and positioned so that other equipment will not Interfere with that Q ❑ a <br /> proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? QPEI ❑ <br /> Was the monitoring panel's backup battery visually inspected functionally tested and confirmed operational? Q ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment?Does the turbine automatically shut down If the piping secondary containment monitoring system fails to operate or is electricall ❑ a <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ❑ ❑ Q <br /> Which sensors initiate positive shutdown? (Check all that apply. ) Sum ❑ UnderAlspenser containment <br /> If alarms are relayed to a remote monitoring station is all communications equipment feu modem ) operational? ❑ ❑ Q <br /> For any answer of "N" above describe In section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. INJANK GAUGING TESTING <br /> IS/I Check this box if tank nauqlnq Is used only for Inventory control. Do not complete this section. <br /> ri Check this box if NO tank gauging egulpment Is installed (Do not complete this section ) Y N NA <br /> This section must be completed If in-tank juaugin Is used to perform leak detection monitoring, <br /> Has all input Wrinq been inspected for kinks and breaks in the cables and for proper entry and termination including testing for ground ❑ ❑ ❑ <br /> faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely functionally tested ❑ ❑ ❑ <br /> and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all Items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> For any answer of "N" above describe in section X1 how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> I <br /> E <br /> d <br /> tEt <br />