Laserfiche WebLink
Vt I t yr nlrvtld - r. rtynlCCrnty vel.rctrun � nt <br /> 259 N Wilma Ave , Ripon , CA 95366 <br /> Phone (209 ) 599-2108 / Fax (209) 599-2685 �� <br /> www cityofripon .org <br /> Erosion and Sediment Control Plan ( ESCP ) F ": Date Submitted :ovzlb <br /> SECTION 1 - PROJECfWRMATION <br /> a Project Type : Other y, Uav 9 A' G L4 hdcrt rounol PA f f ihrvurc, <br /> • Project Address : 1501 N . Jack Tone Rd . . Does project require other permits or requirements? <br /> Ripon CA 95366 If yes , ( ✓ ) check all that apply and provide proof. <br /> ❑ NPDES General Construction Permit ( NOI & SWPPP required ) <br /> • Anticipated Construction Start Date : 08/01 / 19 ❑ NPDES Industrial General Permit <br /> . Anticipated Construction End Date : 08/ 16/ i 9 ❑ MS Phase If Permit ( ESCP and/or Post Development Stds) <br /> ❑ U . S. Army Corps 404 Permit (Clean Water Act) <br /> • Project Size ( indicate sq . ft . or acres ) : 1750 5q . ft . ❑ State Water Board 401 Permit (Water Quality Certification ) <br /> [J Dept . of Fish & Game Section 1600 Agreement (Streambed Alteration <br /> • Approx . Soil Disturbance ( indicate sq . ft . or acres ) : s90 s y fl ❑ waste Discharge Requirements ( non -federal State waters) <br /> • #-of Storm Drain Inlets within 50 ft, of soil disturbance : 0 ❑ Irrigated Lands Regulatory Program (commercial Ag ) <br /> ❑ Low or Limited Threat NPDES Permit (de•watering groundwater) <br /> SECTION 2 - PROPERTY OWNER INFORMATION SECTION 3 - CONTRACTOR INFORMATION <br /> . Name: Pilot Travel Centers LLC . Company Name : Jones Covey Group Inc . <br /> • Mailing Address : 5508 Lonas Rd . e Mailing Address : 9595 Lucas Ranch Rd . <br /> o CitylState/Zip: Knoxville TN 37909 . City/State/Zip : Rancho Cucamonga CA 91730 <br /> . Email : Miluska , Cioffi@PilotTraveICenters " . Email : RSills@JonesCovey . com <br /> . Phone No . : ( 864 ) 474 - 2128 . Phone No . : ( 714) 9754257 <br /> SECTION 4 - BEST MANAGEMENT PRACTICES <br /> SECTION 4. 1 - RUNoON CONTROL BMP' s. When surface flow of storm water runoff is allowed to pass through disturbed soils at an active construction <br /> project it can mobilize sediment and carry it into the municipality's storm drainage system and into the local receiving waters. This results in deposition of <br /> sediment in the municipal drainage system which causes more frequent maintenance and can cause flooding . The sediment is also harmful to the local <br /> waterways . <br /> . Does storm water have the potential to run -on to the construction site? El Yes O No Sandbag <br /> • If yes , will storm water surface flow be diverted around any disturbed soil areas ? ❑ Yes El No nuneon <br /> Show how it will be diverted on the Site Map , (Section 5 - Site Map) <br /> SECTION 4. 2 w EROSION CONTROL BMPs . The definition of erosion is the detachment of soil particles . These particles can become detached by rain , <br /> wind , or construction activity . Although construction by nature disturbs soil , it is vital to place a temporary or permanent covering over disturbed soil as soon <br /> as possible . Projects are not allowed to leave areas of exposed soil that do not have a cover. On the table below and on the site map show how you will <br /> prevent erosion at your protect, <br /> FOR OFFICE USE ONLY <br /> BMP on Site <br /> CASOA BMP Minimum BMP in Plan Map ( If not , <br /> Fact Selected ? Describe the BMP to be implemented . Require- Narrative explanation <br /> Sheet BMP Name (Cheek Box) If not used , state the reason why. men [ 1 Yes No Yes No <br /> Scheduling (work will be conducted during <br /> EC- 1 the dry season ) 0 July/August 2019 V <br /> Preservation of Existing Vegetation <br /> (existing vegetated areas will not be p N/A ✓ l3> <br /> EC-2 disturbed ) <br /> Area to be vegetated with landscaping , turf ❑ <br /> EC-4 or hydroseeding N/A ✓ (s) <br /> Temporary Erosion Control using an <br /> EC-7 erosion control blanket or geotextile Cover Soil Stockpile w Emil - plastic ✓ ta) <br /> Area covered with a temporary or <br /> EC-6 & permanent mulch including straw, wood , ❑ N/A <br /> EC-8 compost, hydromulch ,-or equivalent <br /> Non-Vegetated Stabilization (covered with <br /> aggregate , paving , permanent ❑ N/A ✓ lsl '� <br /> EC - 16 structures/surfaces) <br /> Ind Erosion Control kept moist to <br /> WE _ 1 prevent wind erosion ) ❑ 1 Hose -wet Soil Stockpile to prevent dust ✓ <br />