Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) MENNEN <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault, 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> PST Monitoring Site Plan <br /> Site Address : hIANTECA FAS & FOOD 1229 E. LOUISE MANTECA CA 95366 <br /> { a t J a Drat rine of pipes <br /> O �s T S exit of sump and <br /> B L UDC' s. iso <br /> Q underground <br /> O drain is <br /> . - - - s accurate, we <br /> _ . . . . . . I B P p B { . . . . - cannot speculate <br /> FSO blue prints. <br /> T F n T S i;.f <br /> & If 1 ` J L .l' <br /> . . <br /> IF <br /> . . . . <br /> . . <br /> am <br /> E- STOP. _ _ <br /> .3 tt A, 7. a 8. <br /> KEY <br /> 3 = ANNULAR <br /> F = FILLS <br /> T = TURBLYE <br /> P = PROBE <br /> 1 . Is . 2. . . F, . . 5. is - . 6. V = VAPOR <br /> X = SUNIP SENSOR <br /> T i L = LeakDetector <br /> AI =AIann-av <br /> S4 . . 0 . . . . . . . . . . . . . . . . . . . . . . . 1 1 B = Brine Sensor <br /> . . . . . . . _ . I = Smart Sensor <br /> S = STP <br /> -41� itenuuirl<r�rararltlttrrm-errertii;iblerofile ter7[fiirrgrerlaricimrta-ea C = FloatS & Chains <br /> p-q/essicmlopiraonon?t• atrinesoleh.fa- irfornntrorxrlpfnpxir Drmring 4 4 E = E Stop <br /> rnr ro sccde <br /> Date map was drawn: 8-19-19 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan , <br /> shatr the general layout of tanks and piping. Clearly identify locations of the following equipment, ff installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary contaLnment areas; mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak delecran). In the space provided, note the date this Site Plan was prepared. <br /> LEGEND <br />