Laserfiche WebLink
HAZARDOUS WASTE CONTINGENCY PLAN <br />For use by Unidoes Member Agencies or where approved by your Local Jurisdiction <br />Authority Cited: Title 22, California Code of Regulations (CCR) §66265.52 as referenced by §66262.34(a)(4) or 67450.3(c)(9)(C) <br />Facilities that generate 1,000 kilograms or more of hazardous waste per month, or accumulate more than 6,000 <br />kilograms of hazardous waste on-site at any one time, must prepare a Contingency Plan. Facilities that generate <br />in any month more than 1 kilogram of acutely hazardous waste (AHW), or more than 100 kilograms of debris <br />resulting from the spill of an AHW, or which treat hazardous waste onsite under the Permit by Rule (PBR) <br />onsite treatment tier must also prepare a Contingency Plan. Many facilities that are required to prepare a <br />Contingency Plan are already subject to Hazardous Materials Business Plan (HMBP) reporting requirements due <br />to the quantities of hazardous materials/wastes they have onsite. If you have already prepared a Unidocs <br />HMBP or already have a plan which is equivalent in content to the Emergency Response/Contingency Plan <br />module of the Unidocs HMBP. you have satisfied the Continaencv Plan requirements, and are not required to <br />This site-specific Contingency Plan is the facility's plan for dealing with emergencies and shall be implemented <br />immediately whenever there is an imminent or actual fire, explosion, or release of hazardous waste or a <br />hazardous waste constituent which could threaten human health and/or the environment. At least one copy of <br />the plan shall be maintained at the facility for use in the event of an emergency and for inspection by the <br />local agency. A copy of the plan and any revisions must be provided to any contractor, hospital, or agency with <br />whom special (i.e. contractual) emergency services arrangements have been made (see Section E, below). <br />A. Facility Information: <br />BUSINESS NAME BUSINESS PHONE. <br />Stockton Honda ZUVJ 320-6700 <br />SITE ADDRESS CITY ZIP CODE <br />2002 E. Hammer Lane Stockton 95210 <br />B. Emergency Coordinators: <br />All personnel qualified to act as the facility's Emergency Coordinator• must be listed in this plan. (Note: <br />Emergency Coordinator responses are described in Section F, below.) If more than two people are <br />qualified, list the names, titles, business and 24-hour telephone numbers, and pager numbers of the additional <br />qualified individuals on an attached page in the order in which they will assume responsibility as alternates, then <br />check the box beneath the Emergency Coordinator information table, below, and indicate the list's page number <br />in the space provided. <br />Primary Emergency Coordinator Secondary Emergency <br />❑ (Check box only if applicable) Additional Emergency Coordinators are listed on page of this plan. <br />C. Evacuation Plan: <br />1. The following alarm signals) will be used to begin evacuation of the facility (check all that apply): <br />❑ Bells; ❑Horns/Sirens; ®Verbal (i. e., shouting); ❑Other (sped <br />UN -017 - 1/6 www.unidocs.org Rev. 03/27/08 <br />Coordinator <br />NAME <br />Mark Morgan <br />NAME <br />Paul Anderson <br />TITLE <br />Service Director <br />TITTLE <br />Service Manager <br />BUSINESS PHONE <br />209 320=6700 <br />BUSINESS PHONE <br />209 320=6700 <br />24-HOUR PHONE <br />(916) 337-8587 <br />24-HOUR PHONE <br />(209) 320-6700 <br />/PAGER # <br />) <br />PAGER # <br />( ) <br />❑ (Check box only if applicable) Additional Emergency Coordinators are listed on page of this plan. <br />C. Evacuation Plan: <br />1. The following alarm signals) will be used to begin evacuation of the facility (check all that apply): <br />❑ Bells; ❑Horns/Sirens; ®Verbal (i. e., shouting); ❑Other (sped <br />UN -017 - 1/6 www.unidocs.org Rev. 03/27/08 <br />