Laserfiche WebLink
' A) Total Organic Vapors <br /> A direct reading photoionization detection (PID) meter (11NU PI 101 <br /> or equivalent) will be used to monitor the concentrations of organic <br /> vapor& In the Work area. Measurements will be taken at least once <br /> every 15 minutes during surface and subsurface sample collection. <br /> ' The meter will be calibrated for benzene. Total organic vapor <br /> measurements will be used to determine the appropriate levels of <br /> respiratory protection and conditions for site evacuation. Total <br /> organic vapor concentrations in the workers breathing zone in excess <br />' of 10 ppm above background wi)1 trigger an upgrade from level D to <br /> level C protection. Breathing zone concentrations in excess of 250 <br /> ppm will stogy} the work on-site until the work zone concentrations are <br />' reduced to below 250 ppnr. <br />' EMP[AYEE TRAINING AND INFORMATION <br /> All personnel working have completed the certified 40 hour Osha hazardous <br /> waste trairring course, and have been trained in the following objectives: <br />' o Workers are aware of potential hazards they <br /> may encounter. <br /> o Knowledge and skills necessary to perform the <br /> work with mirfimal risk to works health and safety. <br /> o Familiarization with the Site Safety plan and <br /> site-specific requirements. <br />' The training plan for this site encompasses: <br /> o Potential physical and chemical health hazards. <br /> 1 a Respiratory protection, rationale, use, maintenance <br /> and fit testing. <br />' o Protective clothing, use and maintenance. <br /> o Entry, exit and decontamination procedures. <br />' o Documentation and record keeping procedures. <br /> I4 <br />