Laserfiche WebLink
' January 3, 1994 <br /> Job No 93036 <br />' Page 2 <br /> Based on soil vapor concentrations presented in Table A, approximately 3,455 pounds (561 gallons) of <br /> gasoline were removed during this reporting period The: remediation system has been operating since <br />' August 1989, and since then, approximately 99,260 pounds (16,114 gallons) of gasoline have been <br /> removed and treated Attached are two figures which show the mass of gasoline removed per month <br /> (Figure 1) and the cumulative mass of gasoline removed (Figure 2) <br />' Sincerely, <br /> SUNK ER ENGINEERING & CONSTRUCTION, INC <br />' enard D Long Darrykl R Ataide <br /> Project Manager Environmental Technician <br /> LDL/DRA sp <br />' Attachments Table A = Summary of Soil Vapor Laboratory Results <br /> Figure 1 Gasoline Removed Per Month <br /> Figure 2 - Cumulative Gasoline Removed <br /> Appendix A - Location Map, Laboratory Results and Chain-of-Custody <br /> Forms <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br />' C { CONOCO\93035\QUASOIL3 F P <br /> • E11(.�Illf'('r lilf� ��f1C� C��rl]Cl",.1GC.IC}Y] li1C <br />