Laserfiche WebLink
t:a3 <br /> CALIFORNIA WATER SERVICE <br /> it I am <br /> Stockton District 1602 E Lafayette St, Stockton, CA 95205 <br /> Tel:(209) 464-8311 <br /> s <br /> October 26,2017 <br /> Alisha Olson,AIA,LEED AP <br /> 1450 Harbor Blvd, Ste A <br /> West Sacramento,CA 95691 <br /> Will Serve Letter <br /> Tract or Parcel Map No: 2510 S ST RT 99 W FRON RD—Parcel 171-300-24 <br /> Customer: BP West Coast Products,LLC <br /> Dear Ms. Olson: <br /> California Water Service Company Stockton District("Cal Water")has determined that water is available to <br /> serve the above-referenced project based on the information provided. Cal Water agrees to operate the water <br /> system and provide service in accordance with the rules and regulations of the California Public Utilities <br /> Commission(CPUC)and the company's approved tariffs on file with the CPUC. This determination of water <br /> availability shall remain valid for two years from the date of this letter. If construction of the project has not <br /> commenced within this two year time frame,Cal Water will be under no further obligation to serve the project <br /> unless the developer receives an updated letter from Cal Water reconfirming water availability. Additionally, <br /> Cal Water reserves the right to rescind this letter at any time in the event its water supply is severely reduced <br /> by legislative,regulatory or environmental actions. <br /> Cal Water will provide such potable water at such pressure as may be available from time to time as a result <br /> of its normal operations per the company's tariffs on file with the CPUC. Installation of facilities through <br /> developer funding shall be made in accordance with the current rules and regulations of the CPUC including, <br /> among others,Tariff Rules 15 and 16 and General Order 103-A. In order for us to provide adequate water for <br /> domestic use as well as fire service protection,it may be necessary for the developer to fund the cost of special <br /> facilities,such as,but not limited to,booster pumps,storage tanks and/or water wells, in addition to the cost <br /> of mains and services. Cal Water will provide more specific information regarding special facilities and fees <br /> after you provide us with your improvement plans,fire department requirements,and engineering fees for this <br /> project. <br /> This letter shall at all times be subject to such changes or modifications by the CPUC as said Commission <br /> may,from time to time,require in the exercise of its jurisdiction. <br /> If you have any questions regarding the above,please call me at(209)464-8311. <br /> Sincere <br /> Bret Dahlen <br /> Construction Superintendent <br /> Stockton District <br /> cc: Ting He—Cal Water Engineering Dept <br /> File <br /> Quality,Service. Value. <br /> calwatencom <br /> � o <br />