Laserfiche WebLink
ti�l�TMONITORI G N WELL PURGING AND SAMPLING LOG <br /> Well No <br />' Project Name RPMSEZServe#100966 Project No 5425(62'T-2-&11 <br /> Project Address/City/County55:7- wq (OQ S pC Z ori S ei� a e}J.�--- <br /> -� _ <br /> PURGING&SAMP.LINC INSTRi3NFWTAZ'ION&METHOD z <br />' Water Level Meter ModeVID) C��i tK)S C Interface Probe(Mod.UID) <br /> Water Quality Meter(Model/iD) Ys1 3-5-00 1 Decontamination Method 3-stage bucket (wash, tap rinse, DI rinse) <br /> ' Purging Method PVC Bailer _Vacuum Truck _Submersible Pump Other <br /> Sampling Method Teflon Bailer 41zpisposable Bailer Other <br /> BOREHOLE.&c WEEL CASING VOLUM`Il ORMA Off` <br /> Borehole Diameter(Circle) $" 101, 12" Casing Diameter(Circle) 2" 4" 6" 12" 18" 24" <br /> Borehole Multiplier(BM)(galloes/mot) 091 15 195 Casing Multiplier(CM)WIonslroot) k _0115 065 147 587 132 235 <br /> XONIT01Z3NGTMASLREMENTS . - r 'PURGWG CALCULATIONS <br /> Depth to Free Product(feet) Borehole Volumes(BV) <br /> Depth to Water(DTW)(feet) 5131-33 WC x BM = (BVhgai) x 1 5 BV(gal) <br /> Total Well Depth(feet) 6AI,&q Casing Volumes(CV) <br /> Water Column(WC)(feet) //. 5( WC C t t 3L x CM dt C6 = I&a o � (CV)($ai) x 3 0 CV(g.l) <br /> Free Product Thickness(feet) Free Product Purged(gallons) <br /> PU:RGINGDATA <br /> Cum Vol Purged Electric Conductivity Dissolved Turbidity Odor <br /> �iTime bTW(ft} (gallons) Temp CC) pH-7 ©arm mhos) Oxygen(mg1L) (NTU) (Yes/No) <br /> dJ.S _3 Purgtng Start Time <br /> /8574/ D, s a t e ,� 4 Z/ �- IQ- �J o <br /> a/ l C x . 4/(0 6 r Z/ G <br /> b Y � ! i o �- `fes `fz <br /> ' Total Gallons Purged <br /> Purging End Tzme <br /> SAWLINGDATA - <br /> Time Sampled Depth to Water Q.Sample Time(DTWs) 5 3 i 3-S_ <br /> Filtered Analytical Parameters <br /> Container Types Volumes,&Quantities &eslno) Sample Preservatives (cr035-0u1 a!1 JIW applicable) <br /> (a S S 4(!A <br /> © -to V6 7?1 <br /> y- WELL9ECOV BRYbATA. <br /> Maximum Drawdown(DTWm)(feet) Approximate Flow Rate(GPM) <br /> Recovery - <br /> %Recovery =1- (D TW) x 100 Calculation %Recovery =1 x 100 <br /> Recovery Type Fast Slow o/.Recovery= <br /> _ FIELD PERSONNEL <br /> ATC Representative(s) <br /> ' Subcontractor / <br /> Signature X Date 0 Z//(e 03 <br />