My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
3500 - Local Oversight Program
>
PR0545858
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 6:34:56 PM
Creation date
7/15/2020 3:15:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545858
PE
3528
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Uitramar <br />Ultramar Inc. Telecopy: 209-584-6113 Credit B Wholesale <br />P.O. Box 466 209-583-3330 Administrative ' <br />525 W. Third Street 209-583-3302 Information Services - <br />Hanford, CA 93232-0466 209-583-3358 Accounting <br />(209) 582-0241 <br />ENVIRONMENTAL PROJECT,., <br />QUARTERLY STATUS REPORT, <br />DATE REPORT SUBMITTED: December 21, 1994 <br />QUARTER ENDING: December 31,.1994 <br />SERVICE STATION NO.:.610 <br />ADDRESS: 3300 Waterloo Road; Stockton, California. <br />COUNTY: San Joaquin <br />ULTRAMAR CONTACT: Xenneth R. Earnest TEL. NO: 209-583-5571 <br />BACKGROUND: <br />Ultramar' leased the. site until-' July, 1993. Four- (4) <br />ground -water monitoring wells had been..instal.led by the owners <br />of the .property. °Ultramar i.nstal�led 'three. (3). more <br />groundwater monitoring wells in early 1993. <br />Three (3)underground storage' tanks along. with associated <br />piping was removed in mid-1993. <br />Barings were,.- advanced to ..determine. ...the ..extent of soil <br />contamination. <br />SUMMARY OF THIS QUARTER'S ACTIVITIES: <br />Groundwater monitoring was performed October 13, 1994. <br />RESULT OF QUARTERLY MONITORING: <br />Groundwater samples .-did not exhibit any detectable <br />hydrocarbons during the fourth quarter..1994. <br />PROPOSED.ACTIVITY OR WORK FOR NEXT QUARTER: <br />ACTIVITY ESTIMATED COMPLETION DATE <br />First Quarter Groundwater <br />Monitoring January 1995 <br />A Member of the Ultramar Group of Companies <br />BEACON - <br />#1 Quality and Service <br />
The URL can be used to link to this page
Your browser does not support the video tag.