Laserfiche WebLink
Turbine O <br /> *Turbine0 Turbine � <br /> I Sump Sump Sump FLAT METAL <br /> ANGLE IRON <br /> O REQUIRED <br /> O TO SUSPEND <br /> PROBE <br /> I (SIDE VIEW) <br /> I SUMP RECEPTACLES <br /> 1 / 4o FOR FOUR <br /> SCREW-IN, PROBE <br /> 30 CABLE PLUGS <br /> O 0 0 0El0 20 <br /> I Tank Pad 0 0 I :i-i.® L <br /> TAPE I WEIGHT DOWN <br /> CABLE TO PREVENT <br /> OO 10 Feet- Min. Distance ACCIDENTAL O <br /> Per NFPA 30A MOVEMENT DURING <br /> LEAK TESTING TS-STS <br /> (PROBE CABLE SUMP TEST SYSTEM <br /> PN:600-0200 SPLIT RING o 0 0 <br /> =50 FEET) <br /> POWER CORD <br /> WITH A GROUNDED <br /> SAFETY 3-PRONGED <br /> CONES ` FPLUG <br /> mnao <br /> STS-PRB-12 <br /> ®® z LEAK TESTING <br /> GROUNDED w� PROBE WITH: <br /> 3 PRONG ® TSP-SSP <br /> EXTENSION �1 STAINLESS <br /> STEEL FLOAT <br /> CORD REO'D <br /> TS <br /> -STS <br /> SUMP TEST SYSTEM <br /> TURBINE SUMP <br /> STP WITH TEST SOLUTION <br /> (Side View) <br /> BUILDING <br /> Figure 1.3 Typical Leak Detection Probe— Turbine Sump Installation Figure 1.4 Leak Detection Probe Installation <br /> Overview Turbine Sump <br />