Laserfiche WebLink
OPg 3 <br /> Fol 0 <br /> Turbine O @TurbineO TurbineO <br /> Sump Sump Sump FLAT METAL <br /> ANGLEIRON <br /> O REQUIRED <br /> QO TO SUSPEND <br /> PROBE m m mo 0 <br /> I I (SIDE VIEW) 0 0 <br /> RECEPTACLES <br /> O O / <br /> SUMP o FOR FOUR <br /> I / SCREW-IN, PROBE <br /> ®____ 3 o CABLE PLUGS <br /> O O 0 10 0 10 20 <br /> � Tank Pad -- - - - - -- <br /> oa <br /> TAPE/WEIGHT DOWN <br /> CABLE TO PREVENT <br /> OO 10 Feet- Min. Distance ACCIDENTAL OLij <br /> Per NFPA 30A MOVEMENT DURING <br /> LEAK TESTING TS-STS <br /> (PROBE CABLE SUMP TEST SYSTEM <br /> PN: 600-0200 SPLIT RING o 0 0 <br /> =50 FEET) <br /> POWER CORD <br /> WITH A GROUNDED <br /> SAFETY "N 3-PRONGED <br /> CONES ` PLUG <br /> SUMP <br /> O STS-PRB-12 <br /> 0000 <br /> LEAK TESTING <br /> GROUNDED 1_ PROBE WITH: <br /> TSP-SSP <br /> 3 PRONG <br /> R <br /> EXTENSION ® STAINLESS <br /> STEEL FLOAT <br /> CORD REO'D <br /> TS-STS <br /> SUMP TEST SYSTEM <br /> D <br /> TURBINE SUMP <br /> STP WITH TEST SOLUTION <br /> (Side View) <br /> BUILDING <br /> Figure 1.3 Typical Leak Detection Probe- Turbine Sump Installation Figure 1.4 Leak Detection Probe Installation <br /> Overview Turbine Sump <br />