Laserfiche WebLink
UNDERGROUND STORAGETANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault; 4) devices monitoring product piping; 5) devices monitoring fil/ piping; 6) devices monitoring ventpiping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring venUtransition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> r- ----- -- -'--- --- - -- - -- - - - - -- - - - -- - <br /> site Address: 6437 W Banner Rd — Lodi CA <br /> c> CCOI <br /> Ventsq . . . . . . . . . . . . . 1 . . 0 . . 1 . 1 . . . . _ . . . . _ . . . . . . . <br /> A F V P ❑T _ , <br /> 87 <br /> X <br /> F V P O F V P T <br /> X X <br /> DIESEL 91 . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . _ . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . _ 1111 . _ . . . . . . . . 1111 . - . . . . _ . . . . . . . . . . - . . <br /> . . 10 <br /> 2. 1 . <br /> KEY . _ . . . . - - - - <br /> A = :ri NULAR *PIPING <br /> F = FILLS (ARROWS) <br /> T = TLZ2BLNE Drawing ofpiping <br /> P = PROBE 13 . B 5 . - - - exit of sump and <br /> V = VAPOR UDC's \o <br /> % = SUMP SENSOR underground <br /> L = Leak Detector . . . . . dranmi is &WWAP� <br /> A1 = Afanw•ay . . _ 4 w,ecannot <br /> B = Brine Sensor . . . . . . Speculate blue <br /> I = Smart SensorPrints. <br /> S = STP 15 . .7 1 <br /> C = Floats & Chains <br /> E = E stop <br /> A?W ittvns rn=dare onnd drat are not sicibla to the cert6ing teeh:icimr ora a <br /> prgfassional opbdon on[v aid are sol6btfor hirormatiomd purposes. Drmrbig _ <br /> not to scale <br /> II _ <br /> Date map was draym: 03128110 f _ <br /> Instructions - - <br /> I <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certieation_ On your site plan, - -j- - - <br /> show the general layout of tsnks and piping. Clearly identdy IDcatons of the following equipment, if installed: monitoring system control panels: sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors: sand In-tank liquid level -- - <br /> probes (R used for leak deiectzny In the space provided, note the date INS Site Plan vias prepared. <br /> 1 <br /> LEGEND <br /> MEN�A� <br /> ' N I\j � T <br />