My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
437
>
2300 - Underground Storage Tank Program
>
PR0506406
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2024 2:33:04 PM
Creation date
7/16/2020 8:46:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0506406
PE
2361 - UST FACILITY
FACILITY_ID
FA0002313
FACILITY_NAME
WILSON WAY CHEVRON
STREET_NUMBER
437
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15113052
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
437 N WILSON WAY STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />6. TANK SECONDARY CONTAINMENT TEST <br />Test Method Developed by ❑ Manufacturer © Industry Standard ❑ Professional Engineer <br />Test Type ❑ Pressure © Vacuum ❑ Hydrostatic <br />Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg. <br />Tank ID <br />1 -Regular 87 <br />2 -Super 91 <br />Tank Manufacturer <br />O C <br />O C <br />Tank Capacity <br />12K <br />12K <br />Test Start Time <br />8:30 <br />8:50 <br />Initial Reading <br />-10" Hg. <br />-10" Hg. <br />Test End Time <br />9:30 <br />9:50 <br />Final Reading <br />-10" Hg. <br />-10" Hg. <br />Change in Reading <br />0 <br />0 <br />Pass/Fail Criteria <br />No Loss <br />No Loss <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Tightness Test Results <br />® Pass ❑ Fail <br />I ® Pass ❑ Fail <br />I ❑ Pass ❑ Fail <br />I ❑ Pass ❑ Fail <br />17. PIPE SECONDARY CONTAINMENT TEST <br />Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br />Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Pipe Run ID <br />1 -Regular 87 <br />2 -Super 91 <br />Pipe Manufacturer <br />Smith FRP <br />Smith FRP <br />Test Start Time <br />8:45 <br />8:55 <br />Initial Reading <br />5 Psi <br />5 Psi <br />Test End Time <br />9:45 <br />9:55 <br />Final Reading <br />5 Psi <br />5 Psi <br />Change in Reading <br />0 <br />0 <br />Pass/Fail Criteria <br />No Loss <br />No Loss <br />Tightness Test Results <br />© Pass ❑ Fail <br />© Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail' and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 2of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.