My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2020 11:27:05 AM
Creation date
7/16/2020 10:26:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 6) <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? P r r <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats r r (- <br /> move freely,functionally tested, and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not I✓ r- r- <br /> interfere with their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? r r r <br /> Was the monitoring panel's backup battery visually inspected,functionally tested, and confirmed operational? P r F <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? r r r <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is r r r <br /> electrical) disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? r r r <br /> Which sensors initiate positive shut down? (Check all that apply.) V Sump r Under-dispenser containment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment(e.g. modem) operational? r r r <br /> For any answer of"N"above, describe in section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> Use this section to provide any additional comments about the inventory of the equipment certified. <br /> R E C",".E.7� -4 tu <br /> fv9AH 0 5 2020 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> X. IN-TANK GAUGING TESTING <br /> F Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> I- Check this box if NO tank gauging equipment is installed. (Do not complete this section.) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including r r I- <br /> testing for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, r r r- <br /> functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? P r r <br /> Was accuracy of system's water level readings tested? r r r <br /> Were all probes reinstalled properly? r r r <br /> Were all items on the equipment manufacturer's maintenance checklist completed? Fv' r r <br /> For any answer of"N"above, describe in section XI how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br /> Use this section to provide any additional comments about the inventory of the equipment certified. <br /> Y=Yes, N =No, NA=Not Applicable <br />
The URL can be used to link to this page
Your browser does not support the video tag.