Laserfiche WebLink
Lydia Baker [EH] <br /> From: Lydia Baker [EH] <br /> Sent: Tuesday, January 29, 2019 2:16 PM <br /> To: 'koukis-frank@aramark.com' <br /> Subject: Return to Compliance <br /> Attachments: Aramark 769 Longe St Stockton CA - CECL treatment inspection report 12-28-18.pdf; <br /> CUPA-Documents-eTemplates-Contingency.pdf <br /> Hello Frank, <br /> I've reviewed the RTC you sent over. I closed out four(127, 301, 403,406) of the open violations. Thirteen violations <br /> remain open at this time. Two of the violations are from the tiered permit inspection. I have not received a response to <br /> that inspection yet. I've attached a copy of the report. To close out those violations I still need: <br /> -Return to Compliance certification filled out <br /> -A copy of the written operating instructions for the wastewater treatment unit <br /> -A copy of December 2018 records of the amounts and types of waste treated by the wastewater treatment unit <br /> -A copy of December 2018 records that show the date, type, and quantities of the materials collected and laundered at <br /> the facility <br /> -A copy of records that demonstrate that the wash water conveyances and containers are constructed of materials to <br /> ensure that they are impervious under the conditions of use <br /> -A copy of records and procedures that show that the wash water conveyances and containers are visually inspected at <br /> least twice a year to ensure that waste wash water is not leaking into the underlying soil <br /> -A copy of training program records that demonstrate that the facility personnel are able to safely and properly handle <br /> and clean the reusable soiled textile materials.The records should include the training content and record of employee <br /> training <br /> For the large quantity generator inspection report the statements indicate that everything will be done by <br /> 2/28/2019. So please provide an update by 3/4/2019. Here is what I need to close out those remaining violations: <br /> -102-lab results for the wastes and a statement of what will be done with the wastes <br /> -108-the contingency plan that was provided is missing an emergency coordinator. I've attached an updated form that <br /> includes this information. Please update it and send me a copy. <br /> -112-A copy of the manifest correction letter to DTSC <br /> -114& 115-Designated facility signed copies of manifests: <br /> -011178632JJK (7/17/2018) <br /> -011180916JJK (2/24/2016) (not found on site) <br /> -003040334GBF (3/21/2016) (not found on site) <br /> -011180909JJ K (4/27/2016) <br /> -011180910JJ K (5/10/2016) <br /> -011180912JJ K (5/11/2016 <br /> -011180911JJ K (5/17/2016) <br /> -009400321JJ K (5/24/2016) <br /> -009400319JJ K (5/31/2016) <br /> -011178624JJK (7/26/2016) (not found on site) <br /> -015895895JJ K (9/13/2016) <br /> -015895896JJ K (9/21/2016) <br /> -015895797JJK (9/27/2016) (not found on site) <br /> -015895798JJK (10/4/2016) <br />