Laserfiche WebLink
Underground Storage Tank <br />Monitoring System Certification Form <br />10. MONITORING SITE PLAN <br />Date site plan was prepared: <br />If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br />identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br />a legend for all symbols depicted. <br />SilleAddress: ASA GAS —1330 E YOSEMrTE AVE MAM7ECA, CA I <br />DSL <br />KEY <br />A = A.Nn ..uz Sensor <br />F = FILLS <br />V = VAPOR <br />P = PROBE <br />L = Turbine +L eak Detector <br />X = SC'XIP SENSOR <br />B = Brine Sensor <br />S= Smart Sector <br />C = Floats & Chains <br />E = E Stop <br />.Arlt• items rackrgrored that arena risible to the cert] ft techtridarr are a <br />priillessronal optrron ont - and— sdeh fbr rrjb—ti-1 prapras-- Eirmrrrt, <br />W1 to rode <br />Date map was drawn t 1'23-70. <br />Instructions <br />ATG <br />*PIPLiG * <br />(ARROWS) <br />Dranin-> of piping <br />ent of sump and <br />UDC's. \o <br />underground <br />draaang is accurate. <br />ave cannot <br />speculate blue <br />pttnts. <br />If you already have a diagram that shows all required information. you may include k rather than this page, with your Monitoring System Certification. On your site plan. <br />show the general layout of tanks and piping. Clearly identify locatrons of the following equipment, rf installed monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps. dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for Weak detection). In the spare provided, note the date this Site Plan was prepared. <br />Page 6 of 6 <br />