My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2802
>
2300 - Underground Storage Tank Program
>
PR0516736
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2024 2:36:21 PM
Creation date
7/16/2020 1:21:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0516736
PE
2361 - UST FACILITY
FACILITY_ID
FA0012764
FACILITY_NAME
SAFEWAY FUEL CENTER #1769
STREET_NUMBER
2802
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
2802 COUNTRY CLUB BLVD STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br /> XII. LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors(LLD)are NOT installed. (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? ® ❑ ❑ <br /> Check all that apply.) Simulated leak rate verified: ® 3 GPH ❑0.1 GPH ❑0.2 GPH <br /> Was the testing apparatus properly calibrated? ® ❑ ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ EE <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? ® ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ® ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ® ❑ ❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? ® ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ® ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ® ❑ ❑ <br /> For any answer of"N"above,describe in section Xlll how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM /PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ® Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) ❑Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor Functionality Interstitial Communication <br /> Sensor ID Component(s)Monitored by this Sensor Test Test <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified? ❑ Simulated leak at far ends of the interstitial space. ❑Visual Inspection <br /> ❑Other(Describe the method in section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑Yes ❑ No(Describe the reason in section XV below.) <br /> For any answer of"FAIL"above,describe in section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH=Gallons per hour,Y=Yes,N=No,NA=Not applicable,VPH=Vacuum/Pressure/Hydrostatic,ID=Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.