Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 1 of 6) <br /> Type of Action ❑ Installation Test ® Repair Test ❑Six Month Test ®36 Month Test <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Secondary Containment Test <br /> 7-20-20 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Safeway fueling station <br /> Business Site Address City ZIP Code <br /> 2808 Country Club Blvd Stockton 95204 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test(Print as shown on the/CC Certification.) Phone# <br /> Adam Taylor (559)553 - 5420 Ext. <br /> Contractor/Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> 1028900 8143455 12-29-20 <br /> III. SUMMARY OF SECONDARY CONTAINMENT TESTING RESULTS <br /> Tank ID: (By tank number,stored product, etc.) A 87 B 91 C Diesel D <br /> Tank Containment <br /> Tightness Test Result ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NAElPass El Fail El NA <br /> Product Piping Containment <br /> Tightness Test Result ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ❑ NA <br /> Remote Fill Piping Containment <br /> Tightness Test Result ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ❑ NA <br /> Vent Piping Containment <br /> Tightness Test Result ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ❑ NA <br /> Vapor Recovery Piping Containment <br /> Tightness Test Result ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NAElPass ElFail ElNA <br /> Communication Test Result ElPass ElFail ® NA ElPass ElFail ® NA ElPass ElFail ® NA I <br /> ❑ Pass ❑ Fail ❑ NA <br /> Turbine/Product Piping Sump <br /> Tightness Test Result ❑ Pass ❑ Fail M NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ❑ NA <br /> Fill Riser Sump <br /> Tightness Test Result ❑ Pass ❑ Fail ® NA ® Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ❑ NA <br /> Vent/Transition Sump ID: a b C d <br /> Tightness Test Result ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ❑ NA <br /> UDC ID: 1 2 3 4 <br /> Tightness Test Result ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ❑ NA <br /> UDC ID: 5 6 7 8 <br /> Tightness Test Result ❑ Pass ❑ Fail ® NAElPass ElFail ® NA ElPass ElFail ® NA ElPass ElFail ElNA <br /> UDC ID: 9 10 Ill 12 <br /> Tightness Test Result ❑ Pass ElFail ® NA ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ® NA 1 ❑ Pass ❑ Fail ❑ NA <br /> All items marked"Fail'or"N/A"must be explained in their respective"COMMENTS"section. <br /> IV. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the secondary containment was tested in accordance with California Code of Regulations,title 23, <br /> division 3, chapter 16,section 2637 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> CERS=California Environmental Reporting System,ID=Identification,UST=Underground storage tank,ICC=International Code Council, <br /> NA=Not applicable, UDC=Under-dispenser containment <br />