Laserfiche WebLink
°U '" c <br /> /Ple0� Environmental Health Department <br /> SAN JOAQUIN <br /> COUNTY Wayne Fox , REHS , Interim Director <br /> / PROGRAM COORDINATORS <br /> cgtPFoa�`P Greatness grows here . Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Michael Kith , REHS <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> Melissa Nissim , REHS <br /> July 06 , 2020 <br /> JOE BAGLEY <br /> BAGLEY ENTERPRISES , INC <br /> 2370 MAGGIO CIR #4 <br /> LODI , CA 95240 <br /> Re : LODI MUNI SERVICE CENTER <br /> 1331 S HAM LN SR0082219 <br /> LODI , CA 95242 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of <br /> the application for a permit to replace spill containers and drop tubes on the 87 tank 1 and 87 <br /> tank 3 underground storage tank ( UST) system at the above noted address . The permit has <br /> been approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work . All new addenda supersede the previous ones . <br /> 3 . Provide written notification to ust( slgov . org for the following repairs and testing (a 48- <br /> hour notice is required ) . <br /> • Corrosion protection : Verify corrosion protection for direct bury spill bucket prior to <br /> backfilling . <br /> • Spill bucket test : Verify minimum 5 -gallon capacity and pass a one hour hydrostatic <br /> test ( or equivalent) . Proper drainage must also be verified . <br /> • Overfill prevention verification : Measurement of drop tubes to verify 95 % tank volume <br /> shut off. Verification of flapper functionality . Ensure that all pertinent tank charts and <br /> calculations are available for review at the time of inspection . <br /> • Verification that ball float (s) , if installed , do not interfere with the installed flapper valve . <br /> • Since concrete will be broken near the 87 tanks , a secondary containment test must be <br /> performed on these components once concrete is poured in accordance with the <br /> manufacturer' s guidelines and test results submitted to the EHD within 30 days <br /> of testing . <br /> Please be aware that the facility cannot receive fuel in the 87 tanks UST systems <br /> prior to the EHD inspection and approval. <br />