Laserfiche WebLink
File: 218267 <br /> November 30, 2018 <br /> Slabs which will be subject to light vehicular loads and through which moisture transmission is not a <br /> concern(e.g. driveway)should be underlain by at least 6 inches of compacted baserock,in lieu of any <br /> sand and gravel. The 6 inches of granular subgrade may be included as part of the 24 inches of non- <br /> expansive materials. Exterior landscaping flatwork(e.g.patios and sidewalks)may be placed directly <br /> on proof-rolled soil subgrade materials (e.g. no granular subgrade),however,they will be potentially <br /> subject to greater amounts of shifting and moisture transmission. <br /> As stated previously, in pavement(concrete or asphalt) areas to receive vehicular traffic,all baserock <br /> materials should be compacted to at least 95 percent of their MDD. Also,the upper 6 inches of native <br /> soil subgrade beneath any pavements should be compacted to at least 90 percent of its MDD. <br /> The garage slabs should "float" independently from the perimeter grade beam. The slab should be <br /> separated from the grade beam with an expansion joint completely around the perimeter and at any <br /> interior isolated columns. Ideally, the grade beam at the front of the garage should continue to final <br /> floor elevation, with the slab inside the grade beam. This will help to assure that the garage doors <br /> always shut upon the grade beam, which should experience little or no movement(while the slab has <br /> the potential for greater movements). <br /> To reduce post-construction expansive soil movements(i.e. heave) of any slabs,care should be taken <br /> to keep the subgrade moist for an extended period of time prior to pouring the slabs. Shrinkage cracks <br /> should not be allowed to develop in the soil beneath any proposed slabs. Ideally, all slab areas and <br /> crawlspace subgrade areas should be sprayed, and covered with 10 mil visqueen and any granular <br /> materials as soon as exposed by grading. <br /> Pool <br /> Shells - The pool (and spa) shell(s) should be designed to resist an active soil pressure of 45 pcf <br /> Equivalent Fluid Weight (EFW) in supporting soils with retained slopes less than 4:1 (H:V). An <br /> active pressure of 65 pcf EFW should be utilized for retained slopes with an inclination of 2:1 (H:V). <br /> Where retained slopes are greater than 4:1, though less than 2:1, the designer should linearly <br /> interpolate between 45 and 65 pcf EFW. <br /> Where the pool or spa shell extends above grade and retains water (free-standing), it should be <br /> designed to resist an active water pressure of 63 pcf EFW on the inside face of the shell, in addition <br /> to the active soil forces on the outside of the shell below the free-standing portions. Where the pool <br /> or spa shell extends above the water line and retains soil, the aforementioned active soil pressures <br /> should be utilized for the design of this "wall". Behind any section of wall above the water line, a <br /> back-of-wall drain will need to be installed to prevent build-up of hydrostatic pressures. This drainage <br /> system may consist of a prefabricated drainage panel (i.e. Miradrain)or a gravel and filter fabric type <br /> system. Such drains can discharge into a perforated pipe which carries any collected water to an <br /> appropriate discharge location, or they may connect to the gravel layer at the base of the pool (see <br /> below). <br /> 1I <br />