Laserfiche WebLink
Item # 1 Remarks <br /> 209 CCR 27 -16 (a-e) Failure to conduct the designated UST operator visual inspection at least once every 30 c <br /> 1 ) OBSERVATION : Designated operator reports were not signed within the required time frame . <br /> -The 31112020 , 313112020 , 4130/2020 and 5/2812020 designated operator reports were not signed by the <br /> owner/operator. <br /> REGULATORY GUIDANCE : Within 48 hours of the completion of the designated UST operator visual inc <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. <br /> hours of being provided a signed copy of the report , the owner or operator shall provide a description of E <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified cor <br /> issues . <br /> CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed wi <br /> required time frame in the future . <br /> 2 ) OBSERVATION : The designated operator failed to check and note the correct test dates for the secon <br /> containment and overfill prevention testing on the designated operator inspection reports . According to E <br /> records , routine secondary containment testing was conducted on 3/512018 but retested on 4/6/2018 and <br /> 12128/20 / 8 after repairs . Routine overfill prevention inspection was conducted on 12128/2018 . <br /> REGULATION GUIDANCE: During the inspection , the designated operator shall check that all required t( <br /> maintenance for the UST system have been completed and document the dates they were done . <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are inclu <br /> the required information on the reports . <br /> 3 ) OBSERVATION : The designated operator failed to document all the alarms from the attached alarm h <br /> the 612/2019 designated operator inspection report and failed to check that they were responded to apprc <br /> The missing alarms include : <br /> - ( Q3) PLLD shutdown alarm on the diesel tank on 51 / 8/2019 <br /> REGULATION GUIDANCE : During the inspection , the designated operator shall review the alarm histon <br /> previous inspection , check that each alarm was documented and responded to appropriately , and attach <br /> the alarm history with documentation taken in response to any alarms to the inspection report. <br /> CORRECTIVE ACTION : Ensure that designated operators performing inspections at this facility are inclu <br /> the required information on the reports . <br /> This is a repeat violation , Class It . <br /> Please let me know if you have any questions . <br /> Thank you , <br /> 4 <br />