Recommended Praccsrs fa theTeserq and Verification OfSpit, Nar% leak O uctim am Secondary Cmtanma3t EgtdPment at UST Fadtrtg j
<br /> FOREWORD
<br /> These Recommended Peacficesf r the Testing and lienficanon of Split, Overfill, Leak Detection aid Secondary
<br /> Containment Equipment at UST Facilities have been prepared as an industry service by the Petroleum Equipment '..
<br /> Institute. The text represents the consensus views of the PEI Overfill, Release Detection and Release Previn den
<br /> Equipment Testing Committee, comprised of the following members:
<br /> Edward S. Kubinsky, jr, Chairman Michael T. Frank
<br /> CROMPCO, LLC Maryland Department of the Environment
<br /> Plymouth Meeting, Pennsylvania Baltimore, Maryland
<br /> Matt Bjornson Lord Grainawi
<br /> Biommn Oil Co. Steel Tank Institute, Division of STUSP
<br /> Cavalier, North Dakota Lake Zurich, Illinois
<br /> Scott C. Hoarse Brian Harmon
<br /> Wawa Inc. Tait Environmental Services, Inc.
<br /> Wawa, Pennsylvania Santa Ana, California
<br /> Derry Brevard Kevin Henderson
<br /> Accent Environmental Services Inc. Kevin Henderson Consulting LLC
<br /> Lufkin, Texas Brandon, Mississippi '.,.
<br /> Jim Brown Jim Howard
<br /> Belshim Environmental Services, Inc. Speedway, LLC
<br /> Foothill Rench, California Edison, New Jersey -
<br /> Sullivan D. Curran Ron Kingsbury
<br /> Fiberglass Their: & Pipe Instime UST Services Ceryomtion
<br /> Houston, Texas Owings, Maryland
<br /> Brian Berge Steve Purports
<br /> Tknknology Purpom Engineering Inc.
<br /> Austin, Texas Saukville, Msconsin
<br /> Serving as consultant to the committee was David J Pincey, JD2 Environmental Inc., 800 East Washington
<br /> Street, West Chides, PA 19380.
<br /> AH questions and other communications relating to this document should be sent only to PEI Headquarters,
<br /> addressed to the attention of the PEI Overfill, Release Detection and Release Prevention Equipment Testing
<br /> Committee. '..
<br /> DISCLAIMER '..
<br /> Petroleum Equipment Institute '.
<br /> P.O. Box 2380 Every effm has been made by the PEI Overfill, Release Detection and Rchasse Prevention Equipment Testing
<br /> Tulsa, OK 74101-2380 Commium to ensure the accuracy and reliability of the information contained in this document. However,
<br /> Phone: (918) 494-9696 the Committee, its consultant, and the Petroleum Equipment Institute make no representation, warranty or
<br /> Fax: (918) 491-9895 guarantee in connection with the publication of these recommended practices. The Institute hereby expressly
<br /> Email: RP@pei.org disclaims any liability or responsibility for loss or damage resulting tram the use of these recommended
<br /> wwwpei.org practices; for the violation of any federal, state or municipal regulation with which these practices may be in
<br /> ® 2017 Petroleum Equipment institute conflict; or for the infringement of any patent resulting from their use.
<br /> No part of this document may be reproduced without the pemdssion of PEI.
<br /> pei.org
<br /> PemaeneMM Practices for deTastirg ardvxdfisaeon of5pd6 OwsiC, La kDeteccon aid Secondary Cantansrznt Equipnaril at USi FaaTsoes � PEURP120417 _ _ _
<br /> 3.9 Responding to Spills ....... . . ..... ...... ... ...........6
<br /> 3.10 Vehicle Hazards.......... ..........................................................................................._..................... .............. ..............7
<br /> CONTENTS
<br /> 4. Tank Secondary Containment Integrity Testing ................................................................................... 8
<br /> 4.1 General ..................... ......._...................._.........................................................................._........................................8
<br /> Foreword ..................................................................................................................................................III 4.2 TSok Secondary Containment Integrity forting- Dry Test Method.........................................................................8
<br /> 421 Purpose.................................................................................................._............._........................................8
<br /> SECTIONS '., 4.2.2 Description of Ten................... ..............._.......... ..........................................................................................8
<br /> 4.2.3 Test Candidoas ............._.............................................._................................................................................8
<br /> 1 InVoduction....................................................................................................................................... 1 411 Preparation ...................................................................._..._....................................._........................._.......9
<br /> 1.1 Origin ................_................_......................................................,_...........................................................__............... 1 42.5 Steel Tanks ...................................................................._......................................_........................................9
<br /> 11 Background ............................................................................._................ ................................................................. 1 4.2.6 Fiberglas Tanks......................................_...................._...............................................................................9
<br /> 13 Impose ..........._. _.......................... ........._................_..._.............................................................................. I 4.27 Test Equipment .........................................................._.........................................................._.................
<br /> ... 10
<br /> 1.4 Scope ............. ....... ....._...._. . .
<br /> I .............................. .. ...................................................... 1 4.28 Te:[ Pmcedvre . . ..
<br /> ................_............_........ ... ........._............... ...................................................................... 10
<br /> 1 ..._........................................... _
<br /> j1.5 Use of Other PEI Recommended Practices ........._..................... _.._.............................................._.__..__..........._.2 4.29 Pass/Fail Criteria............ ............................._.............................._.......................... ......._........................ 10
<br />( 1.6 Regulations and Codes........................................_..............._...........................................................................I'll......2 4.3 Tank Secondary Containment Integrity Taring -liquid-filled Test Mcthad.............................................A.......... 10
<br /> i1.7 Importance of Competitor Technicians................._..................................... ................................................................2 4.3.1 General.......................................................................................... ............................................................ 10
<br /> 1 1+8 Nodficadws............................................................ ........_..............._.................................._................... ............_2 4.31 Purpose..................._._........................ .._...........................................__..................................................... 10
<br /> i 4.3.3 Dewriptimaf Test............1_11..._............_1
<br />[ 2. Definitions .................................................................................._.....,.................................................. 3 '', 4.3.4 TextCmdidoas ._............._............................__....._...._._._............._._...._................................................ 1I
<br /> 2.1 ApprWriare Peram..............................._..........................................._............................................ ..........................3 4.35 Preparation..................................._......................_............. ...................._.............................................
<br /> . ... If
<br /> 21 Authority Having Jurisdiction (AHA................................................_........_...............................................................3 4.3.6 SuelTmkr................................................................................................_.........................I........................ II
<br />( 23 Automatic Tank Gauge (ATG) ........._.............................................._..................... ...................................................3 4.3.7 Fiberglass Tanks........_............_..............................................._.............................. ................................... II
<br /> 2.4 Bail Flost Valve._............._...... _.............. ...._._..............................................._...................................._...............3 4.3.8 T tEgaipment ........._........................................._....._....._..............................................._....I......._.......... II
<br /> 25 Class 1, Division l ............_........ ........................................................................_....._...............................................3 4.3.9 Test Procedure.........................................................................................................._............ ......I............... 1I
<br /> d 2.6 Classified Arca..._........................................................................................_........................................................._...3 43.10 Pass/Fail Cdteria....................................................................................................................................
<br /> ...._ II
<br /> 1 2.7 Containment SUMP..........._......._...._..._.................................................................III'..............................................3
<br /> 2.8 Discriminating Sensar.._..............................................................................................................................................3 6. Piping Secondary Containment Integrity Testing ............................................................................... 12
<br />'s 2.9 Dispenser Sump-......................................................................_..................._......................... _.................................3 5.1 General ................._.............................................................._............................................_.......................... _......... 12
<br /> 2.10 Drop 'bM.... ............. ...... .............. .........11.11.................._
<br /> ........................_. ....................................................3 52 PuR . . . . .. .. .. ......................... ........ .
<br /> r2.11 Drop Tube Shutoff Valve .................._.................................................................._..__....._......................._..............3 53 failing Piping Under Psessum... ...................._......... ......_.................... ........................................_......._............... 12
<br /> 2.12 Emergency Stop ............_._............_.............._. ..................................._........._............_........................................3 5.3.1 Description of Text.............................................._......_..............................................................._............... 12
<br /> E2.13 Interstitial Space._..........._................................................................_............................._........................................3 5.32 Test Condifioas ..........__._......................................................................................_.._..............._........._.... 12
<br /> 2.14 Inumsiully Safe Circuit._........................................................ ..._..................._............._........................................3 5.3.3 Preparuim ......................._..................................................... ........_.............,....................I...................I.... 12
<br /> i. 2.15 Leak Detection .._.................................................................._......................_............................................................3 5.3.4 Test Equipment .......................................................................................................................................1111.. 12
<br /> 2.16 Inckou 'tagout ._................................................................................................. _..........._......................................4 5.35 Test Procedure......................................_........................_..........................................................._................ 12
<br /> e2.17 Overfill Alarm ..._............__.._......_..........._.........................._._........._.........._.._.....................................................4 5.3.6 Pass/Pail Criteria.......................................................................................................................................... 13
<br /> 2.18 Penetration Fitting.............._............................._................................................_..._.................................................4
<br /> I: 2.19 Personal ProtectiveEquipment ..._......................_.............._........................................................4 6. Spill Bucket and Containment SumpTesting..................................................................................... 14
<br /> ._ (PPE)..............._._. P
<br /> 220 Probe..............._......... ..........._...............,................................_......._...............................................................4 6.1 Genual ........Inte....._........
<br /> ... .
<br /> .....
<br /> .......rostatic_..........arlo_..............................._............
<br /> ....
<br /> ......
<br /> ... _.........._... ....
<br /> .._. 14
<br /> 221 Riser .........1111...................._. .. 4 62 SNIT BudalmegrkY T<sUng - HYdmmasic Teat Afelhod ................................................................_......_......
<br /> ...
<br /> --- 14
<br />:. ............_...._..................................................._.._..........._. _1 _111........................._........
<br /> 222 Safety Data Sheer (SDS).........-................_..............................._........................_..................................._....._..........q ', 6.21 Purpose................_.........................._.........................................................................................................__ Il,
<br /> 2.23 Sensor............... ........................... ......................................_.............................._............._...._..............._....._.........4 6.2.2 Description ofTest.........._.................................................................................................................
<br /> . .. . ... .. ._ i4
<br /> 214 Shear Valve....................................................................._..................._..............._...._..............I .............. 4 6.2.3 Test Equipment ........................... .................................._....................................................................._...... 14
<br /> 2.25 SpillBucket......._............__...................................._........................_........................................................................4 6.2.4 Pmpmdm ............ _......................................................._............................................................................ 14
<br /> 216 STP..................._..............._............................._..............._..._.................................................._................................4 615 Test Procedure................................................................_................................................_........................... 15
<br /> 2.27 Submersible Tmbin< Pump....... ............... .___....................._..............._....................................................... ........4 61.6 Pass/Fail Criteria........ ...... .... .__..1.11.1.._._ .. ............ IS
<br /> _
<br /> 218 Test Boot _.............................._..........._..................................... _............................................................_................4 6.3 Spill Bucket Integrity Turing - Vacuum Tut Method.........._................................................................................ 15
<br /> 63.1 Purpose................_................. ................. ..._.............................................................. ............................... IS
<br /> 3. Safety................................................................................................................................................... 5 63.2 Desorption of Test.............................. .. . ......................I............... ....... . _....................._..................1.1 .... 15
<br /> 3.1 Genual .............._......_....... ............................................. .............._....................................... ................................5 63.3 Test Equipment ......................Ill................................ . ............................ ............................. .................. 15
<br /> 3.2 Chemical Hazards ............._........................................................... ................ ......................................_....................5 6.3.4 Pmpanim....................._........ .................... ._......... .............._....._...._........................._............I............ 16
<br /> 3.3 Electrical Hazards ..........................................._........_.........................................._............................._..................._.5 63.5 Tut Procedme................................................................................,......._........I..............................1111.......... 16
<br /> 3.4 F and Explosion Hazards . .... ..............1111 .........................1.41.1. . ........... . ... _ ...............................1....1..... .......5 63.6 Pass/FailCriteria.................... .............................1 .1 . 1 ......1 ......1 ... . .................. ... ...... .... 16
<br /> 35 People Hazards...._.................................._.............. ................................................................................................._.6 6.4 Double-Walled Spill Bucket Integrity Testing - Vacuum Test MGhod ............................._.._._............_............ 16
<br /> 3.6 Tut Equipment........................ . ... ........ . ............ ................ ............................................................................6 6.4.1 Purpose................+,.............. ...... ............................................................................................... .. ........ 16
<br /> 3.7 Calmed Space Entry 11................1 ..11 . ........ ...................................... ......_.................................. ..... .. ........6 6.4.2 Desrnptimof Test 1....1 ......11 . . .........1 ..1 ......1 .1 . 1 .....11 ........1 . ..........._..........._ 16
<br /> 3.8 Use of Water Venus Product for Turing........ ...........111 ............... ....1 ........1 .1 ..1 ...... ..6
<br /> ® pei.urg
<br /> pei.arg
<br />
|