My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
3408
>
2300 - Underground Storage Tank Program
>
PR0517521
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 12:16:21 PM
Creation date
7/20/2020 8:50:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0517521
PE
2361
FACILITY_ID
FA0013484
FACILITY_NAME
FOOD 4 LESS FUEL CENTER*
STREET_NUMBER
3408
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16422011
CURRENT_STATUS
01
SITE_LOCATION
3408 MANTHEY RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reminvanded PraNca for the lening and Vmfiatim of Sp;t OvedB, telt OetodOn and Secondary Contynmern Equipmsm at UST fi dwes PEURP1200-17 - - ----- - ---- <br /> APPENDIX C4 <br /> l <br /> ', fadsgrvame; oamer. <br /> Appendix C contains sample test data sheets that can be used when conducting testing and verfficatim of spi 1, over- Address: Aaaress <br /> fill, leak detection and secondary mnLelnment equipment, shear vahes and emergency steps at underground storage , yyata cop code: pry, cute, Zip code: <br /> tank IM facilities. Electronic wisions of the forms also ere aYailable at wnnny pei.orp/rp1200. <br /> Fac$ly I.D. B: Plana t. <br /> Appendix C (pages 46 - 56) contains the following data sheets Testing company: Phone B: Date: <br /> • Appel CL' Tank Secondary CwdainmeM Integrity Testing Dry Test Method Thtadata sheal6 (w testYtgine kNegdq dine dry secondary cOtdaFnment N a underground storage tank NST), See HVRP1200 <br /> Section 4.2 fm IMLest procedure. <br /> • Append'a G2: Piping SecondwYCeintairvnent lnterVilyTesting Tanktmmbar <br /> • Appendix CS: 6p6 Bucket lnbV4 Testing Hydmstatk Test Method Single and Doubler\Veiled , Tank Material <br /> Vacuum Test Method Pmdud stoned <br /> • Appendix CA: Contalnmerd Sump lntegdtyTesting Hydmstadc Testing Method Tank apaaty,• ppnans <br /> • Appendix O5: LIST (hwfill Equipment Inspection AxAnmatic Shutoff Device and Bali Float Valve Test slartnme <br /> Inoue! 1'ecuum Reading, <br /> • Appendbx 06: Overfill Alarm Operation inspection Indees Ng (See Tame <br /> • Appendix C7: Automatic Tank Gauge Operation Inspection d-i Dekwy <br /> Specified Test Duration ❑ ilcor OShour 0 hour 0 how 131 Mur 131 or <br /> • Appendix C8: Liquid Sera" wnctlonalttyTesting (Sae To me e-1 below.) 02 MVR 0 hours 02 hours 13 haws 0 hours 02 Mine <br /> • Append OB: MochaNcal and ElecUoric lice Leak Detectors Performance Tests Test FixdTOM '... <br /> R <br /> nchalnt <br /> esHNg <br /> • Append C-10: ShearVal\n Operation inspection Inches <br /> • Appendix C-it, Emergerdy Strip Swdtrh Operation Inspection Is the Annular space ❑Yes ONO <br /> ❑Yes ONO Dyes 0140 Ores ONO Dyes OND ❑Yes ONO <br /> Dry After Na Test? <br /> Test Results ❑Pass OFdg OPd53 OFag OPass Of it I ❑ Pass Dead! ❑ Pass OFeg ❑ Pass ❑ Fad <br /> Minims Vacuum, Capacity, Dumtinn, <br /> inches Hg gallons noun <br /> <20,000 ••• 1 <br /> 20,000e 2 '.. <br /> Comments: <br /> '. •Totaltank wRazrry, Ududing ea wmparlmenos lnamuNmmpaNnent lank <br /> Tester's Name (Pito) Testers Signature <br /> ® p <br /> pei.org ei.org <br /> Retcvmxeded Praeftes for theTasung andVed aidon of Spal, omit teak Detecicn and Semndany Cwraintnmt Equiptmnt at UST fauces 'kr' PEIVRP1200-17 <br /> APPENDIX C*3 <br /> Fadwty Name: r Dnner. Fadfty Name: 0aner. <br /> Addfesc Address: <br /> Aridness: Manu: <br /> dLY. stat;, Zip cone: ply'.sate, Z$ case: <br /> dry. State, ZIP Code: ply, State, Zip Code: Fee" W. M. Phone /: <br /> Testing Compar - Phone B: ate: <br /> Fealty I.D. g: Phone e: Tons procedure b lO test the leak integrity d en®e- find doubaxa9ed spill buckets. See PF/RP1200 Section 6.2 for l innate de test <br /> TssWg company. Phone 9: Date: m:ied. Se<UOn6.3len dngbwa&tl tacuvm test method aid 5actbn fiA for daumaweCsd sacrum test melted. <br /> Tank Number <br /> This procedure is wassi the We" of the werstpW space of doubt vruk 1plaint Sae PD/RP1200 Section 5 for Na test '.. pmdud Staetl <br /> procedure. ',...,,.... Split BucMl <br /> Tek Number ap ay <br /> Piping Run Atanuinturer <br />( NPIng A•aierial CasswUlon ODDUNavralkd ❑ Doublo-waged ODoniU B <br /> a led ❑ Doume-%eOed ODoubkxeikd ODOutlevaIled <br /> l Productstwed Test TM OH)dnostatk ❑ Hydrostatic OH)dmstatk OHadnoddic 0hwrostatk; 11Hydmstatic <br /> I Owcuum ❑Vacwm Owcwm Owawm ❑Vawum ❑wcuum <br /> Tont wart Time OSin@eweaed OSInVa Iled OSIno"siletl Og'nglei\apad 0S!ngktwged OSInglewaPetl <br /> ODuals%vlied O ❑ Ooubrelied OCwUem lied ODcuble-W <br /> 21ed <br /> ItiuTerslPressure, ps $ SpitBueiadTyOPradd ❑ Pmtlud ❑Produt OPmdvd ❑ Poduct ❑ Produc <br /> ecedurespecMes OVapor OwpOr Oww Ow O\4Mf ❑wpr <br /> bpd$) <br /> LiquWariddTest Fnd Ifee re .ed from Oyes OLIO ❑vas ONO Oy ONO OYss ONO Oyes Oto Oyes [Ilia <br /> Flml Test Pressure, ps�g copal Docket?` <br /> Pressure charge (NO <br /> 040cocks, loom <br /> ed inspection <br /> reduction in Pressure Vo <br /> elkmedforpass.) para iuoc sepasa- ❑ Pass 13 Fal ❑ Paas OFad ❑ Pass OFal ❑ Pass ❑ FePo ❑ Pass ❑ Fail ❑ Pass ❑ fail <br /> Lan done buc ed <br /> TestResults ❑ Pass OFfl ❑ Pass Until ❑ Pass OFaa ❑ Pass Ofag ❑ Pass ❑ Fan ❑ pass Olath <br /> l from e i0 pipe.) <br /> Camnenb Tank inner sup Oyes ONO Oyes ONO Dyes ONO Dyes Oto Oyes ONO Dyes ❑ coo <br /> Included In Leel? OVA Ota 0N OIDI ❑ fiA ❑ ILA <br /> DraM wire OYes ONo Dyes ONO Oyes Oso O'w'es ONo Oyes ONO Oyes ONO <br /> Included in Lear? ❑ NA ❑ m OtiA 0N 01 ❑ m <br /> smiting Larval <br /> Tess Start Time <br /> Ending LnH <br /> Tan Ftd Time <br /> Test Period <br /> Level Change <br /> Pass/faii crAeda: Must Pau v'aual Inspection. HrdmsUtle: \ester kvd drop of less than 1/6 inch; waaum sirg[ - Wed only: <br /> Malma!n at load 26 bichos nater column; Vacuum double %aikd: maintain at least 12 Wnes water column. <br /> Test Results OPam 0Fa3 1 ❑ Pass OFaft Cl Pass 0N ❑ Pass OFail ❑ Pass ❑ Fel OPdss OFaPo <br /> Comments: <br /> *AS Melds and dells mud be d'sposed Of properly. <br /> Testers Name (pint) Testers Signature Tester's Name (prim) Tester's Signature <br /> pei.org pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.