Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for NATIONAL PETROLEUM as of May06 , 2020 . <br /> Open violations from May 28, 2019 inspection <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #210 - DO monthly reports not maintained on site for 12 months or for 36 months ( after October 1 , <br /> 2018 ) . <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #306 - Monitoring equipment is not installed or maintained to detect a leak at the earliest <br /> opportunity . <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #316 - Secondary containment not constructed to prevent water intrusion (after Jul 2003 ) . <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #320 - Failure to comply with the installation , inspection , or record keeping of the overfill <br /> prevention . <br /> Page 2 of 3 <br />