Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 5/7/2020 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors, and 11) devices monitoring any other secondary containment areas. <br /> Site Address: KWIK SERVE 420 KETTLEMAN LANE LODI CA 95240 <br /> KEY <br /> A = ANM7 .4R Sensor <br /> F = FILLS <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> L' = 17:1POR <br /> P = PROBE <br /> L = Turbine f Leak Detector 5 , � _ <br /> X = SU PSENSOR — s <br /> B = Brine Sensor <br /> S = Smart Sensor <br /> C = Floats 8i Cltains <br /> E = E Stop <br /> . x <br /> 3 _ . . . Diesel 87 <br /> . I d I I I I I I . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 106 6 <br /> 100 91 <br /> - WA ATF OIL. - O VFHTR <br /> *PIPE\G <br /> (ARROWS) . . . . . . . _ <br /> D ra%NntE of <br /> pipinz exit of <br /> sump and UDC's. - CAS — . <br /> No undersound <br /> drawing is <br /> zccurat. 114M JITG <br /> cannot speculate <br /> bluePV "� `� ' 4rf • trent mrkrgrarorlrlrcvlrrc` r7 risible to tlz certj(ifngten]a7ieimr ca P a <br /> p•gfessierxrlopr�arrorq't• mrin-�• scde$•fce- ir�arnx:ricrnl�n�e�-. DrmrirU <br /> not to scde <br /> Data map teas drawn: 5M10 <br /> Instructions <br /> If you already have a diagram that shows all required Information, you may include ii, rather than this page, with yourfdonitoring System Certification. On your site plan, <br /> shcn the general layout of tartks and piping. Clearly identify IocaEors of the following equipm=-nt, if Installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leakdetectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> LEGEND <br />