Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of s) <br /> XII. LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors(LLD)are NOT installed.(Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? N ❑ ❑ <br /> Check all that apply.) Simulated leak rate verified: N 3 GPH ❑0.1 GPH ❑0.2 GPH <br /> Was the testing apparatus properly calibrated? N ❑ ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ N <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? N ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? N ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ® ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ® ❑ ❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? N ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? N ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? N ❑ ❑ <br /> For any answer of"N"above describe in section Xlll how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM/PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) N Vacuum ❑Pressure N Hydrostatic <br /> Sensor Functionality Interstitial Communication <br /> Sensor ID Component(s)Monitored by this Sensor Test Test <br /> S25 87A PRODUCT LINE N Pass ❑ Fail N Pass ❑Fail <br /> S26 87A VAPOR LINE N Pass ❑ Fail N Pass ❑ Fail <br /> S27 87A VENT LINE N Pass ❑ Fail N Pass ❑ Fail <br /> S28 87B PRODUCT LINE N Pass ❑ Fail N Pass ❑Fail <br /> S29 87B SYPHON LINE N Pass ❑ Fail N Pass ❑Fail <br /> S30 87B VENT LINE N Pass ❑ Fail N Pass ❑Fail <br /> S31 91 PRODUCT LINE N Pass ❑ Fail N Pass ❑Fail <br /> S32 91 VENT LINE N Pass ❑ Fail N Pass ❑Fail <br /> S33 ADDITIVE PRODUCT LINE N Pass ❑Fail N Pass ❑Fail <br /> S34 ADDITIVE VENT LINE N Pass ❑Fail N Pass ❑Fail <br /> ❑Pass ❑Fail ❑ Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> How was interstitial communication verified? N Simulated leak at far ends of the interstitial space. ❑Visual Inspection <br /> ❑Other(Describe the method in section XV below.) ❑Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? N Yes ❑No(Describe the reason in section XV below.) <br /> For any answer of"FAIL"above,describe in section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH=Gallons per hour,Y=Yes,N=No,NA=Not applicable,VPH=Vacuum/PressureMydrostabc,ID=Identification <br />