Laserfiche WebLink
Eu t.E 9lZVON NJO b MI 'El 'a 4W awil p;AIaaaa <br /> #109 The first testing took place on 11/27/2017 by Afforda-Test- Ben Duncan and failed. <br /> Flite IV was called and the repair delay was due to part order and man-time availibilty, <br /> It was rousted 0n 3/12/2018 with Betty Ho and passed. The six month testing will <br /> take place again in September 2018. <br /> 1/209 Afforda-test-designated operators were informed and Icctured on the violations <br /> will ensure all is documented correctly, <br /> #313 Dispenser 3/^/44 were repaired by Elite IV see work order dated 2/22/2018. <br /> Ce r'S ey �'OII I' 3 57 ff <br /> PKECE <br /> VED <br /> MAR 13 2018 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> C3 <br /> £i£ d << z t£zz£atsoz t dOIS Nom Aoni 95:2L £l £0 8602 <br />