Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: SYSTEM TRANSPORT 707 E. ROTH ROAD FRENCH CAMP CA 95231 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . <br /> . . . . . <br /> ATG IN BLDG/SHOP OFFICE <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . <br /> . . . . . . . . . . . DIESEL. . . . . . . . . . . . . . . . . . . . . . N , <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> O . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . <br /> O <br /> X . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . <br /> O <br /> SAT 2. <br /> . . . . . . . . . . . . . . . . . . . . . . . 21 <br /> . . . . . . . . . . . <br /> *PIPING* <br /> (ARROWS) . . . . . . . . . KEY. <br /> Drawing of A=ANNULAR Sensor <br /> piping exit of . . . . . . . . . . . . . . . . . . ` F=FILLS <br /> sump and UDC's. . . . . . . . . ' ' ' ' ' ' ' . . . . . . SAT 1. . . . V=VAPOR <br /> No underground . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . P=PROBE <br /> drawing is . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . L=Turbine/Leak Detector <br /> accurate,we . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . X=SUMP SENSOR <br /> cannot speculate B=Brine Sensor <br /> blue prints. Any items underground that are not visible to the certifying technician are a S=Smart Sensor <br /> professional opinion only and are solely for informational purposes. Drawing not to C=Floats&Chains <br /> scale. E=E Stop <br /> Date map was drawn:5-30-18. <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />