Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: <br />3 <br />Check <br />this <br />box if <br />tank gauging is used only for inventory control. <br />❑ <br />Check <br />this <br />box if <br />no tank gauging or SIR <br />equipment is <br />installed. <br />No* <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />G. Line Leak Detectors (LLD): <br />� Check this box if LLDs are not installed. <br />Complete <br />the following <br />checklist: <br />❑ <br />Yes <br />Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Li <br />Yes <br />❑r <br />a <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />No* <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ <br />❑ <br />Yes <br />Was the testing apparatus properly calibrated? <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />Yes <br />❑ <br />Yes <br />No* <br />N/A <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑ <br />* <br />In <br />the <br />Section <br />H. below, <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />disconnected? <br />describe how and <br />when these deficiencies <br />Yes <br />were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />� Check this box if LLDs are not installed. <br />Complete <br />the following <br />checklist: <br />rx <br />Yes <br />❑ <br />❑ <br />No* <br />N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all <br />that apply) Simulated leak rate: 03 g.p.h.; ❑❑ 0.1 g.p.h ; ©0.2 g.p.h. <br />❑r <br />Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Cx <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />Ex <br />Yes <br />❑ <br />❑ <br />No* <br />N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />Yes <br />❑ <br />Lx <br />No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />Yes <br />❑ <br />ix <br />No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />disconnected? <br />❑ <br />Yes <br />❑ <br />IR <br />No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />fails a test? <br />u <br />Yes <br />a <br />No* <br />N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />rx <br />Yes <br />n <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* <br />In <br />the Section <br />H. below, describe <br />how and when these deficiencies <br />were or will <br />be corrected. <br />H. Comments: <br />Inspector on site to witness test. <br />Old SN: 17051149 <br />New SN: 18031476 <br />Monitoring System Certification Page of 12/07 <br />