My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
345
>
2300 - Underground Storage Tank Program
>
PR0540987
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 1:30:05 PM
Creation date
7/21/2020 9:33:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0540987
PE
2351
FACILITY_ID
FA0023459
FACILITY_NAME
Pilot Travel Center Lathrop - 1017
STREET_NUMBER
345
STREET_NAME
ROTH
STREET_TYPE
Rd
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
345 Roth Rd
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />2. TESTING CONTRACTOR INFORMATION <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: ®Hydrostatic 11 Vacuum 11 Other <br />Test Equipment Used: Measuring Tape <br />Equipment Resolution: Visual <br />3 <br />4 <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc. <br />1 87 <br />2 91 <br />❑ Direct Bury <br />X Contained in Sump <br />❑ Direct Bury <br />❑ Contained in Sump <br />❑ Direct Bury <br />❑ Contained in Sum <br />Bucket Installation Type: <br />❑ Direct Bury <br />® Contained in Sump <br />Bucket Diameter: <br />12" <br />12" <br />Bucket Depth: <br />16" <br />16" <br />Wait time between applying <br />vacuum/water and start of test: <br />15 Minutes <br />15 Minutes <br />Test Start Time (TI): <br />9:15 am <br />9:15 am <br />Initial Reading (RI): <br />141/2"Test <br />End Time (TF): <br />5 am <br />10:15 am <br />Final Reading (RF): <br />r14/2 <br />/2 <br />141/2Test <br />Duration (TF — Tj): <br />r. <br />1 Hr. <br />Change in Reading (RF - RI): <br />0.00 <br />0.00 <br />Pass/Fail Threshold or <br />Criteria: <br />0.00 <br />0.00 <br />Test Result: <br />© Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended folloly-rrp for failed tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THI5 TESTING <br />I hereby certify that all the irtforrrtation contained in this report is true, accurate, mrd in full compliance with legal requirements. <br />Technician's Signature <br />� 08 23 2018 <br />State laws and regulations <br />may be more stringent. <br />do not currently <br />require testing to be performed by a qualified contractor. However, local requirements <br />
The URL can be used to link to this page
Your browser does not support the video tag.