Laserfiche WebLink
I ' <br /> . 07 September 1999 <br />' AGE-NC Project No 95-0104 <br /> Page 8 of 8 <br />' remediation in the hydrocarbon-impacted vadose zone may not be necessar, <br /> • Continued quarterly monitoring and sampling of all ground water monitoring wells (MW-1 <br />' through MW-6) during the October 1999 sampling event to monitor deeper ground water <br /> downgradient and/or crossgradient of VW-1 The October quarterly sampling results will <br /> supplement the Soil Vapor Extraction/In-Situ Air Sparging pilot test <br />' 7.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluations of the geologic/hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br /> available data points (i a monitoring wells, ground water samples and soil gas samples) and <br /> subsurface conditions may vary away from these data points No other warramy, expressed or <br />' implied, is made as to the professional recommendations contained in this report <br /> I <br /> I <br /> I <br /> I <br /> I <br /> IAtli ancedCcoEmironmcnlal Inc <br />