Laserfiche WebLink
23 October 1995 <br /> AGE-NC Project No 95-0104 <br /> Page 5 of 5 <br /> A Corrective Action Plan, indicating soil vapor extraction as the preferred remedial option for the <br /> site, has been submitted to the PHS-EHD Upon approval, installation of the soil remediation system <br /> should commence Monitoring well MW-1 will be utilized for extraction, this should facilitate <br /> tvolatilization of hydrocarbons in the area of this well Therefore, based upon results of the most <br /> recent sampling, we do not recommend implementation of a dedicated ground water remediation <br />' system at the site <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br />' environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluations of the geologic/hydro geologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of available <br />' data points, and subsurface conditions may vary away from these data points No other warranty, <br /> expressed or implied, is made as to the professional recommendations contained in this report <br /> 1 <br />