Laserfiche WebLink
24 November 1997 <br /> AGE-NC Project No 95-0104 <br /> Page 4 of 4 <br /> i42 RECONDAENDATIONS <br /> Based upon the results of this investigation, AGE recommends the following <br /> i • A Revised Corrective Action Plan (RCAP)was submitted to PHS-EHD on 18 February 1997 <br /> Upon approval of the RCAF, a Remedial Action Work Plan should be prepared and <br /> remediation should commence <br /> The next quarterly monitoring should be scheduled for December 1997 It is recommended <br /> that quarterly sampling be performed only from monitoring wells with proper screened <br /> intervals across the top of the ground water table <br /> i <br /> 50 LIMITATIONS <br /> IOur professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing In this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluations of the geologic/hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of available <br /> data points(i a monitoring wells) and subsurface conditions may vary away from these data points <br /> I No other warranty, expressed or implied, is made as to the professional recommendations contained <br /> in this report <br /> i <br /> I <br /> 1 <br /> I <br /> I <br /> 1 <br /> i <br /> Ads anted GeoEnvironmental,Inc <br /> I <br />