Laserfiche WebLink
SAN I STR I CT <br /> SA?+PLING PROTOCAL FOR ROUTINE TANK' REMOVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil. <br /> samples collected shall be representative of native soils beneath the tank's ! <br /> invert (tank 's bottom) at a collection depth not be exceed)2 - A feet. It contamination <br /> is documented during closure, an Unauthorized Release notification must be filled out and <br /> submitted to SJLHD within 5 days. Section 2652, CCR. <br /> WATER NOT PRESENT IN THE TANK PIT , <br /> —._ ----__ <br /> .............-_......................................_._........._...-....._.........I..............__..._....--- - <br /> TANK SIZE MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> Less than 1000 gallons ONE per tank Fill or pump end of tank <br /> 100' f--]l 0,000 gallons TWO per tank One a each end of tank <br /> 10,001 gallons and up THREE OR MORE Ends and Middle or <br /> per tank enerallyy 'paced alongg <br /> he length !oi the tanf <br /> Piping ONE EVERY ;E20 LINEAL FEET <br /> .--............................. ............... ........................................ <br /> ..._. _......_.. -_.._.. ........_____:.._.........-- <br /> WATER IS PRESENT IN TANK PIT, <br /> ------- _------------ <br /> - -----------------------------._..................__..................................................... ....._..._._..___..:y'- <br /> TANK SIZE MINIMUM NO. OF LOCATION OF SOIkL MINIMUM NUMBER <br /> SOIL SAMPLES SAMPLES IOr WATER SAMPLES <br /> --�.�-—= ..—...-- ........__...... ._..._..._..........__._..__.._.... ................................_..................._._........-...................... <br /> ..........._........._..._... --- <br /> T0,000 GALLONS From wall next to <br /> ' OR LESS tank ends at soil/ -~ <br /> (Single Tank) TWO groundwater ONE <br /> _ -- interface <br /> GREATER THAN From wall next t'oONE <br /> 10,000 GALLONS tank ends at soil/ <br /> OR groundwater <br /> TANK CLUSTER FOUR interface <br /> OTHF�R SEPECI A , CONDI TI ONS <br /> SLAB PRESENT IN TANK PIT ' <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through <br /> the obstruction will be required in order to collect the samples (Physical removal of the <br /> obstruction will then allow sampling according to the abovelcond!itions. ) a <br /> I <br /> TANK SIZE MINIMUM NUMBER OF LOCATION OF. SOIL SAMPLES <br /> SOIL SAMPLES <br /> Less than 1000 gallons THREE per tank Center and `ends or sides <br /> 1000 - 10,000 gallons FIVE per tank Center and ends or sides <br /> 10,001 gallons and up FIVE OR MORE per Ends and Middle and <br /> tank generallyy spaced along <br /> the length of the tank <br /> EH 23 047 12/88 <br /> REVISED 1/89 <br />