Laserfiche WebLink
�Ncv IG 20OG 9. 35AM R--pace Env i r onmenta Z , Inc f '7'7� 851 -7240 F• 3 <br /> 1 <br /> T .V,icki tAcCartney <br /> November 15, 2006 <br /> Page 2 of 3 0 <br /> As previously approved.based or,field observations and PID TnQasurements;.at lit three <br /> coir.saamplcs per bong Mil be submitted fair laboratoky aniIysls, Thxese soil samples sho std <br /> ineluele those collected at the approximate depth of the boa am of the former IJST 0 5 fee: <br /> below sub-geade), at the groundwater table',interface(i.e., capillary fringe), and at the total <br /> depth of the soil borings. Additional sod -,iunples may be stub sri.twd for analysis,if required <br /> to adequately characterize the site, Ficld observations and'sample selection will be reviewed <br /> with the EHD hazvxdous materials inspector,griOT tO sampl1y subs irAJI te,the lab, <br /> As previously approved,the soil swrip es will be sealod with"IT€:fiono Film&id plastic end i <br /> caps, labeled,packaged in an iced cooler, and transported wit1►chair,-of custody <br /> documentation to a state of California-certified hazardous waste testing laboratory for <br /> analysis. Each of the, soil samples will be iaWyzed on a sI:AndGs.;d.tum-arouud tirae for TF'H- <br /> as-gasoline ane'i BTEX by E?A Wthad 9021B/8015M or 260B, and for•NITRE,DIPE, <br /> ETBE, TAME,TBA and 1,2-DCA by EPA Method 8260B- <br /> From all three soil borings,groundwater samples will.be eollectedd from the,boreholes using <br /> /a-inch diameter PVC temporary wells. T�e temporary weiIls will consist of 15 feet of flush- <br /> tlireaded atnd maiclrirae-slotted (1}.02(3-inch)'.well screen spa approximately#i-ve feet <br /> abo-c and ten feet biedow th.e depth.cif statin groundwater. B wik PVC casings will.tiffead <br /> into the tops of the well screens and exiend to the surface. 1's?exther a sand pack nor a well <br /> seal will be installed in tl e temporary wzll�. <br /> As previously appw-e€1, pritir togroundwater sampling,tbe temj)orary wells will be purged <br /> of at least three casing volumes using a bailer. During pluging, �roundwater temperature, pI I <br /> and eiectrzcalorxcitacdvitoy wvili btrecorded to evaluate t'.he stability of these para-meters. <br /> Once the ground-water in the temporary wells is purged and recri.arged to at least 90%of its <br /> original groundwater column tWck ess,the grourldws:ater sarnples will be collected. I <br /> As previously approved, each of the.g=ro&,4water samples will lir;-collected Using <br /> decontaminated polyethylene bailers and laboratory-jap-I lied cot tanners, The sample <br /> containers will.be labeled, packaged in an iced coolor,aad,traRsported vdi.h chaln-of=custody <br /> documentation to a state of California-cerrtified ha7-ardous waste ies€ing laboratory for <br /> analysis. The laboratory will aaalyTzc the --oundwator smnples for T PFI-as-gasoline and <br /> BTEX by EPA Method 8021B/901.511 or 9260B, and for 1,ITBE',.DIFE,BTB:E, T A1w�tE, TBA <br /> and 1,2-DCA by EPA Mexlzc�d ir260B. <br /> As previously approved.,upon completion of the gruundwater wimpling at.each location,-ihe <br /> temporary-wells will be remov4�-d and the boreholes will be sealed with neat ce-�rezrt grout, <br /> using a txemie pipe. Ibe surface will' tsc restored with asphalt or concrete patches. <br /> I <br /> I� <br /> 1 <br />