My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
222
>
3500 - Local Oversight Program
>
PR0545869
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 10:37:04 AM
Creation date
7/21/2020 10:30:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545869
PE
3528
FACILITY_ID
FA0003764
FACILITY_NAME
SJ COUNTY COURT HOUSE
STREET_NUMBER
222
Direction
E
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
14916001
CURRENT_STATUS
02
SITE_LOCATION
222 E WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> WESTERN RESOURCE MANAGEMENT <br /> STANDARD OPERATING PROCEDURES <br /> Soil Vapor Sampling <br /> TEMPORARY SOIL VAPOR PROBE INSTALLATION <br /> Soil vapor probes will be installed by drilling a shallow boring SAMPLE IDENTIFICATION AND CHAIN-OF- <br /> to a minimum of 5-feet below ground surface. The drilling CUSTODY PROCEDURES <br /> rod will act as a temporary casing with disposable Sample identification and chain-of-custody procedures <br /> polyethylene tubing threaded through the drill rods to a ensure sample integrity as well as document sample <br /> retractable screen section in the drill tip. The annular space - possession from the time of collection to ultimate disposal. <br /> will be sealed with bentonite which will be allowed to hydrate Each sample container submitted for analysis is labeled to <br /> for approximately 20 minutes prior to system purging and identify the job number, date, time of sample collection, a <br /> sample collection. Modeling clay or equivalent will be used sample number unique to the sample, any in-field <br /> to form an air tight seal around the drill rod at the ground measurements made, sampling methodology, name(s) of <br /> surface. Sufficient tubing will be exposed to allow for on-site personnel,and any other pertinent field observations <br /> extraction of soil vapor by an air sampling pump. Excess also recorded on the field excavation or boring log. Chain- <br /> tubing will be Where soil vapor samples are required from of-custody forms are used to record possession of the <br /> multiple depths, the probe rod will be driven to each sample from time of collection to arrival at the laboratory. <br /> designated sampling depth and sealed with hydrated During shipment,the person with custody of the samples will <br /> bentonite prior to purging and collection of each soil vapor relinquish them to the next person by signing the chain-of- <br /> sample. custody form(s) and noting the date and time. The sample <br /> control officer at the laboratory will verify sample integrity, <br /> SOIL VAPOR PROBE PURGING AND SAMPLING correct preservation, confirm collection in the proper <br /> The soil vapor sampling protocols will be implemented in container(s), and ensure adequate volume for analysis. If <br /> accordance with the California Department of Toxic these conditions are met, the samples will be assigned <br /> Substances Control(DTSC)Guidance for the Evaluation and unique laboratory log numbers for identification throughout <br /> Mitigation of Subsurface Vapor Intrusion to Indoor Air,dated analysis and reporting.The log numbers will be recorded on <br /> December 15,2004(revised February 7,2005). Prior to soil the chain-of-custody forms and in the legally-required log <br /> vapor sampling, each temporary soil vapor probe is purged book maintained In the laboratory. The sample description, <br /> by evacuating a minimum of three system volumes using an date received, client's name, and any other relevant <br /> air pump adjusted to provide a constant flow rate of less than information will also be recorded. <br /> 200 milliliters per minute at a pressure of less than 25 inches <br /> of water column. Once the system has been purged, LABORATORY ANALYTICAL QUALITY ASSURANCE <br /> samples are extracted from the vapor probe using a syringe, AND CONTROL <br /> glass bulb,Summa's canister or are captured and stored in a In addition to routine instrument calibration, replicates, <br /> Tedlar bag at the same flow rate and pressure used for spikes, blanks, spiked blanks, and certified reference <br /> purging. Immediately prior to sampling, a tracer gas materials are routinely analyzed at method-specific <br /> (typically 1,1-diflouroethane)is applied to the drill rod at the frequencies to monitor precision and bias. Additional <br /> ground seal to check seal integrity and to the sample components of the laboratory Quality Assurance/Quality <br /> manifold to evaluate ambient air intrusion. Control program include: <br /> SOIL PROBE BORING ABANDONMENT 1. Participation in state and federal laboratory <br /> Upon completion of soil vapor sampling activities, drilling accreditation/certification programs; <br /> rods will be removed from the boring and the borehole will 2 Participation in both U.S. EPA Performance Evaluation <br /> be abandoned by filling it for its entire depth with a neat studies (WS and WP studies) and inter-laboratory <br /> cement grout in accordance with applicable regulatory performance evaluation programs; <br /> guidelines. <br /> 3. Standard operating procedures describing routine and <br /> VAPOR SAMPLE DELIVERY periodic instrument maintenance; <br /> Following vapor sampling, the sample containers are 4. "Out-of-Control"/Corrective Action documentation <br /> transported under chain-of-custody documentation to an procedures;and, <br /> ELAP accredited laboratory for analysis within the applicable <br /> holding time for the sample method and containers used. 5. Multi-level review of raw data and client reports. <br />
The URL can be used to link to this page
Your browser does not support the video tag.