My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
222
>
3500 - Local Oversight Program
>
PR0545869
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 10:37:04 AM
Creation date
7/21/2020 10:30:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545869
PE
3528
FACILITY_ID
FA0003764
FACILITY_NAME
SJ COUNTY COURT HOUSE
STREET_NUMBER
222
Direction
E
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
14916001
CURRENT_STATUS
02
SITE_LOCATION
222 E WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 WORK PLAN, ADDITIONAL SITE INVESTIGATION <br /> .., The objectives of the proposed scope of work are to further define the lateral extent of impacted soil <br /> and groundwater, southwest (up-gradient) and southeast (cross-gradient) of the former UST source <br /> area. To achieve this objective, two soil borings will be drilled on-site for soil and groundwater <br /> sampling. <br /> 3.1 Project Planning and Permitting <br /> Prior to initiating fieldwork, a site-specific health and safety plan will be prepared according to 29 <br /> `y CFR 1910.120. The health and safety plan will include safety procedures for work to be performed, <br /> chemical hazard information, site safety officers, and a medical emergency location. <br /> V <br /> To perform the proposed scope of work, drilling permits will be obtained from EHD. Since all of the <br /> drilling will be conducted on-site, neither off-site access agreements nor encroachment permits will <br /> be required. At least two working days prior to field work, Ramage Environmental will notify EHD <br /> and Underground Service Alert so that regulatory and utility inspections can be scheduled. <br /> 3.2 Soil and Groundwater Sampling and Analysis <br /> To further assess the lateral extent of impacted soil and groundwater, soil and groundwater <br /> samples will be collected from two on-site soil borings. The proposed soil borings will be located in <br /> .,, the southwest corner of the sub-grade parking area and in the southeast corner of the street grade <br /> asphalt parking area. These proposed boring locations are shown on Figure 3. <br /> A C-57 licensed drilling contractor will drill the soil borings with 8-inch diameter hollow-stem augers. <br /> Both proposed soil borings will be drilled to further evaluate a silty sand interval previously- <br /> encountered at approximately 30 to 35 feet below street grade. Since the sub-grade parking area <br /> is approximately 11 feet below street grade, the soil boring proposed for the southwest corner of the <br /> sub-grade parking area should only be drilled to a depth of approximately 25 feet. The ultimate <br /> depths of the soil borings will depend on the lithologic and hydrogeologic conditions observed <br /> during drilling. <br /> .r <br /> V <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.