Laserfiche WebLink
CERS Consolidated Emergency Response/Contingency Plan <br /> INTI'RNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY(Check all that apply): cit. <br /> E I VERBAL WARNINGS; 0 2.PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑3.TELEPHONE: <br /> ❑4 PAGERS; E 5.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> NOT]F ICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY(Check all that apply): c]'- <br /> ❑ I VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑3.TELEPHONE; <br /> ❑d.PAGERS; E 5.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> EMFRGENCY COORDINATOR CONTACT INFORMATION: C13. <br /> PRIMARY EMERGENCY COORDINATOR NAME: Steve Blankenship PHONE NO.: (209) 518-1498 PHONE NO.: <br /> ALIFRNATE EMERGENCY COORDINATOR NAME: Robert Jensen PHONE NO.: (209) 518-5694 PHONE NO.: <br /> ❑Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Note:If more than one alternate emergency coordinator is designated,attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND.CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility's procedures for containing spills and preventing and mitigating releases,fires and/or explosions. <br /> Dl. <br /> ❑ I MONITOR FOR LEAKS,RUPTURES,PRESSURE BUILD-UP,ETC.; <br /> ❑2 PROVIDE STRUCTURAL PHYSICAL BARRIERS(e.g.,Portable spill containment walls,built-in berms); <br /> ❑ PROVIDE ABSORBENT PHYSICAL BARRIERS(e.g.,Pads,spill pigs,spill pillows); <br /> ❑4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> ❑5 LINED TRENCH DRAINS AND/OR SUMPS; <br /> ❑6 AUTOMATIC FIRE SUPPRESSION SYSTEM, <br /> ❑7 ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> ❑8 STOP PROCESSES AND/OR OPERATIONS; <br /> ❑9 AUTOMATIC/ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> ❑ 10.SHUT OFF WATER.GAS,ELECTRICAL UTILITIES; <br /> ❑ <br /> 11.CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> ❑ 12.NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> ❑ 13.ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION: <br /> ❑ 14.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> ❑ 15.REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> ❑ 16.FIIRE LICENSED HAZARDOUS WASTE CONTRACTOR. <br /> ❑ 17.USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT, <br /> Q <br /> 18.VACUUM SUCTION USING APPROPRIATE VACUUM(e.g.,Intrinsically safe)FOR SPILL CONTROL AND/OR CLEANUP; <br /> ❑ 19.DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE: <br /> ❑20.PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> ❑21.OTHER(Specify): D'` <br /> E. FACILITY EVACUATION <br /> TI 11:FOLLOWING ALARM SIGNAL(S)WILL BE USED TO BEGIN EVACUATION OF THE FACILITY(Check all that apply): El. <br /> ❑ I BELLS; E2. <br /> ❑2 HORNS/SIRENS; <br /> M 3 VERBAL(i.e.,Shouting); <br /> F±1 4 OTHER(Specify): Intercome <br /> Till:FOLLOWING LOCATION(S)WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S)(e.g.,Parking lot,street comer): E3. <br /> Assembly Area--A9 on map(front of Building) <br /> Note The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: E4. <br /> ❑ I WRITTEN PROCEDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑2.EVACUATION MAP(S)DEPICTING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑> OTHER(Specify): E5. <br /> Note Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS'FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES(Check one of the following): Fl. <br /> Fol I HAVE BEEN DETERMINED NOT NECESSARY: <br /> ❑2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE(Specify): 172. <br /> Note:Advance arrangements with local fire and police departments,hospitals,state and local emergency response teams,and/or emergency services <br /> contractors should be made for your facility,if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev.03/07/17 Page 2 of 4 <br />